Search Results

There are 59924 results for: content related to: Evaluating relief valve reliability when extending the test and maintenance interval

  1. Thrust force calculations for pressure safety valves

    Process Safety Progress

    Volume 25, Issue 3, September 2006, Pages: 203–213, Robert D'Alessandro P.E.

    Article first published online : 12 MAY 2006, DOI: 10.1002/prs.10138

  2. A fuzzy clustering–ranking algorithm and its application for alarm operating optimization in chemical processing

    Process Safety Progress

    Volume 24, Issue 1, March 2005, Pages: 66–75, Zhiqiang Geng, Qunxiong Zhu and Xiangbai Gu

    Article first published online : 18 JAN 2005, DOI: 10.1002/prs.10060

  3. A heuristic approach of calculating spray water flux needed to avert fire-induced runaway reactions

    Process Safety Progress

    Volume 25, Issue 3, September 2006, Pages: 189–202, Dilip K. Das

    Article first published online : 28 APR 2006, DOI: 10.1002/prs.10135

  4. A review of estimation methods for flash points and flammability limits

    Process Safety Progress

    Volume 23, Issue 1, March 2004, Pages: 47–55, M. Vidal, W. J. Rogers, J. C. Holste and M. S. Mannan

    Article first published online : 30 MAR 2004, DOI: 10.1002/prs.10004

  5. Revisiting DIERS' two-phase methodology for reactive systems twenty years later

    Process Safety Progress

    Volume 25, Issue 3, September 2006, Pages: 180–188, Hans K. Fauske

    Article first published online : 26 APR 2006, DOI: 10.1002/prs.10133

  6. A fast thermal activity interpreter for controlling chemical reaction hazards

    Process Safety Progress

    Volume 23, Issue 2, June 2004, Pages: 108–113, Hans K. Fauske

    Article first published online : 29 JUN 2004, DOI: 10.1002/prs.10025

  7. New generic leak frequencies for process equipment

    Process Safety Progress

    Volume 24, Issue 4, December 2005, Pages: 249–257, John Spouge

    Article first published online : 13 OCT 2005, DOI: 10.1002/prs.10100

  8. Characterization and safe handling of reactive initiator solutions

    Process Safety Progress

    Volume 25, Issue 4, December 2006, Pages: 303–310, James A. Klein and Gordon R. Mros

    Article first published online : 13 OCT 2006, DOI: 10.1002/prs.10150

  9. Emergency venting requirements for tempered systems considering partial vapor–liquid separation with disengagement parameters greater than unity: Part II: Application

    Process Safety Progress

    Volume 23, Issue 2, June 2004, Pages: 86–98, Robert D'Alessandro

    Article first published online : 29 JUN 2004, DOI: 10.1002/prs.10014

  10. Risk-based maintenance (RBM): A new approach for process plant inspection and maintenance

    Process Safety Progress

    Volume 23, Issue 4, December 2004, Pages: 252–265, Faisal I. Khan and Mahmoud Haddara

    Article first published online : 16 NOV 2004, DOI: 10.1002/prs.10010

  11. BLEVE blast by expansion-controlled evaporation

    Process Safety Progress

    Volume 25, Issue 1, March 2006, Pages: 44–51, A.C. van den Berg, M.M. van der Voort, J. Weerheijm and N.H.A. Versloot

    Article first published online : 14 DEC 2005, DOI: 10.1002/prs.10116

  12. Modeling dispersion and deposition of smoke generated from chemical fires

    Process Safety Progress

    Volume 30, Issue 2, June 2011, Pages: 168–177, Shahryar Khajehnajafi, Reza Pourdarvish and Hardik Shah

    Article first published online : 4 APR 2011, DOI: 10.1002/prs.10450

  13. Containment system design

    Process Safety Progress

    Volume 25, Issue 4, December 2006, Pages: 280–289, Joseph Leung and Warren Greenfield

    Article first published online : 29 AUG 2006, DOI: 10.1002/prs.10149

  14. Quantifying LOPA uncertainty

    Process Safety Progress

    Volume 31, Issue 3, September 2012, Pages: 240–247, Raymond “Randy” Freeman

    Article first published online : 18 JUN 2012, DOI: 10.1002/prs.11493

  15. Sizing of throttling device for gas/liquid two-phase flow part 1: Safety valves

    Process Safety Progress

    Volume 23, Issue 4, December 2004, Pages: 335–344, Ralf Diener and Jürgen Schmidt

    Article first published online : 29 NOV 2004, DOI: 10.1002/prs.10034

  16. Reactivity screening made easy

    Process Safety Progress

    Volume 23, Issue 2, June 2004, Pages: 99–107, Georges A. Melhem

    Article first published online : 29 JUN 2004, DOI: 10.1002/prs.10024

  17. Validation of spring operated pressure relief valve time-to-failure

    Process Safety Progress

    Volume 29, Issue 1, March 2010, Pages: 55–59, Stephen P. Harris and Robert E. Gross

    Article first published online : 17 AUG 2009, DOI: 10.1002/prs.10344

  18. Relief vent sizing for deflagrations

    Process Safety Progress

    Volume 25, Issue 2, June 2006, Pages: 130–134, Ron Darby

    Article first published online : 30 MAR 2006, DOI: 10.1002/prs.10131

  19. Analyzing hazards of sour water spills

    Process Safety Progress

    Volume 26, Issue 4, December 2007, Pages: 315–323, J.L. Woodward

    Article first published online : 25 SEP 2007, DOI: 10.1002/prs.10222

  20. A model for estimating the probability of missile impact: Missiles originating from bursting horizontal cylindrical vessels

    Process Safety Progress

    Volume 26, Issue 2, June 2007, Pages: 129–139, Ravi Pula, Faisal I. Khan, Brian Veitch and Paul R. Amyotte

    Article first published online : 10 NOV 2006, DOI: 10.1002/prs.10178