SEARCH

SEARCH BY CITATION

Keywords:

  • unrelated machines;
  • PTAS;
  • approximation

Abstract

We study the problem of scheduling n independent weighted jobs on a constant number of unrelated parallel machines so as to minimize the weighted sum of job completion times Rm∣∣∑wjCj. We present an O(n log n) time approximation scheme for the non-preemptive case of this problem. Notice that when the number of machines is not a constant (i.e. R∣∣∑wjCj) then no PTAS is possible, unless ��=����. Copyright © 2000 John Wiley & Sons, Ltd.