Research Article
A PTAS for the average weighted completion time problem on unrelated machines
Article first published online: 27 OCT 2000
DOI: 10.1002/1099-1425(200011/12)3:6<323::AID-JOS52>3.0.CO;2-E
Copyright © 2000 John Wiley & Sons, Ltd.
Issue
1099-1425/asset/cover.gif?v=1&s=713a24f62f0b2a40d4934d3c654feda368b1d6fd)
Journal of Scheduling
Special Issue: Approximation Algorithms: Part 2
Volume 3, Issue 6, pages 323–332, November/December 2000
Additional Information
How to Cite
Afrati, F., Bampis, E., Kenyon, C. and Milis, I. (2000), A PTAS for the average weighted completion time problem on unrelated machines. Journal of Scheduling, 3: 323–332. doi: 10.1002/1099-1425(200011/12)3:6<323::AID-JOS52>3.0.CO;2-E
Publication History
- Issue published online: 27 OCT 2000
- Article first published online: 27 OCT 2000
Funded by
- PLATON
- French Ministry of National Education, Research and Technology
- Abstract
- References
- Cited By
Keywords:
- unrelated machines;
- PTAS;
- approximation
Abstract
We study the problem of scheduling n independent weighted jobs on a constant number of unrelated parallel machines so as to minimize the weighted sum of job completion times Rm∣∣∑wjCj. We present an O(n log n) time approximation scheme for the non-preemptive case of this problem. Notice that when the number of machines is not a constant (i.e. R∣∣∑wjCj) then no PTAS is possible, unless =. Copyright © 2000 John Wiley & Sons, Ltd.