Chapter 11. Some Key Factors in Obtaining Maximum Results from Statistical Process Control

  1. John B. Wachtman Jr
  1. Rex M. Burdette

Published Online: 26 MAR 2008

DOI: 10.1002/9780470314449.ch11

Proceedings of the 55th Porcelain Enamel Institute Technical Forum: Ceramic Engineering and Science Proceedings, Volume 15, Issue 3

Proceedings of the 55th Porcelain Enamel Institute Technical Forum: Ceramic Engineering and Science Proceedings, Volume 15, Issue 3

How to Cite

Burdette, R. M. (1994) Some Key Factors in Obtaining Maximum Results from Statistical Process Control, in Proceedings of the 55th Porcelain Enamel Institute Technical Forum: Ceramic Engineering and Science Proceedings, Volume 15, Issue 3 (ed J. B. Wachtman), John Wiley & Sons, Inc., Hoboken, NJ, USA. doi: 10.1002/9780470314449.ch11

Author Information

  1. Bootz Plumbingware Company Evansville, IN 47719

Publication History

  1. Published Online: 26 MAR 2008
  2. Published Print: 1 JAN 1994

ISBN Information

Print ISBN: 9780470375310

Online ISBN: 9780470314449

SEARCH

Keywords:

  • management;
  • deviation;
  • environment;
  • parameters;
  • program

Summary

Factors important in gaining fill results from SPC are identified It is stressed that a committed top management group is essential.