Prebake Potline Restart after Power Supply Interruption

  1. Carlos E. Suarez
  1. Mikhail Lukin1 and
  2. John Johnsson2

Published Online: 23 MAY 2012

DOI: 10.1002/9781118359259.ch126

Light Metals 2012

Light Metals 2012

How to Cite

Lukin, M. and Johnsson, J. (2012) Prebake Potline Restart after Power Supply Interruption, in Light Metals 2012 (ed C. E. Suarez), John Wiley & Sons, Inc., Hoboken, NJ, USA. doi: 10.1002/9781118359259.ch126

Author Information

  1. 1

    RUSAL Kubikenborg Aluminium AB, Sundsvall, 85 176, Sweden

  2. 2

    RUSAL Engineering and Technology Center, 37/1 Pogranichnikov str, 660111, Krasnoyarsk, Russia

Publication History

  1. Published Online: 23 MAY 2012
  2. Published Print: 17 MAR 2012

ISBN Information

Print ISBN: 9781118291399

Online ISBN: 9781118359259

SEARCH

Keywords:

  • Potline Restart;
  • Cell Restart Methods;
  • Clad Failure

Summary

This chapter contains sections titled:

  • Introduction

  • Power Failure and Line B Disconnection

  • Restart techniques consideration

  • Start-Up Preparation

  • Pot Line Startup

  • Results