Get access
Advertisement

Moving horizon approach of integrating scheduling and control for sequential batch processes

Authors


Abstract

Online integration of scheduling and control is crucial to cope with process uncertainties. We propose a new online integrated method for sequential batch processes, where the integrated problem is solved to determine controller references rather than process inputs. Under a two-level feedback loop structure, the integrated problem is solved in a frequency lower than that of the control loops. To achieve the goal of computational efficiency and rescheduling stability, a moving horizon approach is developed. A reduced integrated problem in a resolving horizon is formulated, which can be solved efficiently online. Solving the reduced problem only changes a small part of the initial solution, guaranteeing rescheduling stability. The integrated method is demonstrated in a simulated case study. Under uncertainties of the control system disruption and the processing unit breakdown, the integrated method prevents a large loss in the production profit compared with the simple shifted rescheduling solution. © 2014 American Institute of Chemical Engineers AIChE J, 60: 1654–1671, 2014

Get access to the full text of this article

Ancillary