Optimal averaging level control for the tennessee eastman problem

Authors


Abstract

This paper focuses on an industrial test problem, the Tennessee Eastman problem. The Tennessee Eastman process is moved to three operation modes with 90/10, 50/50 and 10/90 product G/H ratios. The base control system proposed in an earlier paper can properly control the process at all the three operation modes. Optimal averaging level control is added to the base control to improve the control of product flow during random and step feed disturbances. A new implementation of the optimal feedback averaging control algorithms (McDonald et al., 1986) is presented in order to deal with random disturbances. Simulation results show that control of product flow rate is significantly improved by using the optimal feedback averaging level control at all three operation modes.

Abstract

On s'intéresse dans cet article à un problème industriel test, le «Tennessee Eastman Problem». Le procédé est réglé sur trois modes de fonctionnement pour des rapports G/H de produit de 90/10, 50/50 et 10/90. Le système de contrǒle de base proposé dans un article antérieur peut servir à ces trois modes de fonctionnement. Un contrǒle de niveau moyen optimal est ajouté au contrǒle de base de façon à améliorer le contrǒle de l'écoulement du produit lors des perturbations aléatoires et régulières de l'alimentation. On présente une nouvelle implantation des algorithmes de contrǒle moyen par rétroaction optimal (McDonald et al., 1986) afin de traiter les perturbations aléatoires. Les résultats des simulations montrent que le débit de produit est considérablement arnélioré par ce type d'algorithme pour les trois modes de fonctionnement.

Ancillary