SEARCH

SEARCH BY CITATION

Keywords:

  • Drying process control;
  • spouted bed;
  • predictive control;
  • adaptive control;
  • optimization

Abstract

During the last 8 years, the Drying Center at Universidade Federal de São Carlos has been investigating the control problems of drying process of pasty materials associated with the spouted bed dryer. Starting with structures involving PI controller, we also implemented advanced MPC control techniques and real time optimization (this last one based on simulations only). Different control structures were implemented in a pilot spouted bed dryer where the behavior of the system was tested for water and homogenized chicken eggs. Based on promising results, the perspective is to use an adequate control system in a spouted bed scale-up.

Ces huit dernières années, le Centre de Séchage à l'Université Fédérale de São Paulo a étudié les problèmes de contrôle du procédé de séchage de matériaux pâteux avec la technique du séchoir à lit jaillissant. En commençant par des structures nécessitant le recours au contrôleur PI, on a également utilisé des techniques de contrôle MPC avancées et l'optimisation en temps réel (cette dernière étant basée sur des simulations uniquement). Différentes structures de contrôle ont été appliquées dans un séchoir à lit jaillissant où le comportement du système a été testé pour l'eau et des oeufs de poules homogénéisés. Considérant les résultats prometteurs, l'idée est d'utiliser un système de contrôle adéquat dans un système extrapolé de lit jaillissant.