SEARCH

SEARCH BY CITATION

References

  • Alfageme S, Headland J, Smith E. 2002. Modeling to access impacts of proposed sub-channel placement cells in Newark Bay, Port of New York and New Jersey. In: Garbaciak S Jr, editor. Proceedings of the Third Specialty Conference on Dredging and Dredged Material Disposal: Dredging 2002 Key Technologies for Global Prosperity; 5–8 May 2002. Orlando (FL): American Society of Civil Engineers. p 2535.
  • Fredette TJ, Jackson PE, Demos CJ, Hadden DA, Wolf SH, Nowak TA Jr, DeAngelo E. 2000. The Boston Harbor Navigation Improvement Project CAD cells: Recommendations for future projects based on field experience and monitoring. In: Proceedings of the Western Dredging Association, Twentieth Technical Conference and Twenty-second Texas A&M Dredging Seminar; 25–28 June 2000. Warwick (RI) Center for Dredging Studies, Texas A&M University. p 291302.
  • Fredette TJ, Jackson PE, Murray PM, Hadden DA, Bell DL. 1999. Preliminary monitoring results from the phase II Boston Harbor confined aquatic disposal cells. In: Proceedings of the Western Dredging Association, Nineteenth Technical Conference and Twenty-first Texas A&M Dredging Seminar; 15–18 May 1999; Louisville (KY) Center for Dredging Studies, Texas A&M University. p 255275.
  • Fredette TJ, Jackson PE, Rogers CJ, Hadden DA, Wolf SH, Nowak TA Jr, DeAngelo E. 2002. Monitoring results from the Boston Harbor Navigation Improvement Project confined aquatic disposal cells. In: Pederson J, Adams EE, editors. Dredged Material Management: Options and Environmental Considerations. Proceedings of a Conference; 3–6 December 2000. Cambridge (MA): MIT Sea Grant College Program, Massachusetts Institute of Technology. p 310.
  • Germano JD. 2003. Designing borrow pit CAD sites: Remember Newton's third law! In: Randall RE, editor. Proceedings of the Western Dredging Association Twenty-Third Technical Conference; 10–13 June 2003; Chicago, IL. College Station (TX): Center for Dredging Studies. p 302312.
  • Kane-Driscoll SB, Wickwire WT, Cura JJ, Vorhees DJ, Butler CL, Moore DW, Bridges TS. 2002. A comparative screening-level ecological and human health risk assessment for dredged material management alternatives in New York/New Jersey Harbor. Human Ecol Risk Assess 8: 603626.
  • Moore RF, Spadaro PA, Degens S. 2002. Ross Island Lagoon: A case study for confined disposal of contaminated dredged material, Portland, Oregon. In: Garbaciak S Jr, editor. Proceedings of the Third Specialty Conference on Dredging and Dredged Material Disposal: Dredging 1002 Key Technologies for Global Prosperity; 5–8 May 2002. Orlando (FL): American Society of Civil Engineers. p 27.
  • [MPCA] The Minnesota Pollution Control Agency. 2004. Record of decision for the sediment operable unit St. Louis River/Interlake/Duluth Tar Site, Duluth, Minnesota. St. Paul (MN): The Minnesota Pollution Control Agency. 109 p.
  • Murray P, Carey D, Fredette TJ. 1994. Chemical flux of pore water through sediment caps. Proceedings of the Second International Conference on Dredging and Dredged Material Placement. November 1994, Lake Buena Vista, FL. p 10081016.
  • Myre (Murray) P, Fredette TJ, Jackson PE, Wolf SH, Ryther JH Jr., 1998. Monitoring results from the first Boston Harbor Navigation Improvement Project confined aquatic disposal cell. In: Randall RE, editor. Proceedings of the Fifteenth World Dredging Congress: Dredging into the 21st Century & Exhibition; American Society of Civil Engineers. 28 June–2 July 1998. Vancouver (WA): Western Dredging Association. p 415430.
  • Shaw J, Whiteside P, Ng K. 1998. Contaminated mud in Hong Kong: A case study of contained seabed disposal. In: Randall RE, editor. Proceedings of the Fifteenth World Dredging Congress: Dredging into the 21st Century & Exhibition; 28 June–2 July 1998; Las Vegas, NV. Vancouver (WA): Western Dredging Association. p 799810.
  • [USACE] US Army Corps of Engineers. 2001. Final environmental impact statement: Providence River and Harbor Maintenance dredging project. Concord (MA): New England DistrictCE.
  • [USACE] US Army Corps of Engineers. 2002. Los Angeles County regional dredged material management plan pilot studies, Los Angeles County, California: Evaluation report, Appendix A, evaluation of aquatic capping alternative. Los Angeles (CA): USACE.
  • [USACE, MPA] US Army Corps of Engineers, Massachusetts Port Authority. 1995. Final environmental impact report and final environmental impact statement, Boston Harbor, Massachusetts: Navigation Improvement Project and Berth Dredging Project. Waltham (MA): Massachusetts Port Authority, Maritime Department. EOEA file 8695.
  • [USEPA] US Environmental Protection Agency. 2000. Puget Sound Naval Shipyard Complex: Record of decision. Portland (OR): Region 10. EPA/541/R–00/516.
  • Whiteside P, Ng K-c, Lee W-p. 1996. Management of contaminated mud in Hong Kong. Terra Aqua 65: 1017.