Antoon Kolen sadly passed away on October 3, 2004. His coauthors dedicate their contribution to this paper to his memory.
You have free access to this content
Interval scheduling: A survey
Article first published online: 16 MAR 2007
DOI: 10.1002/nav.20231
Copyright © 2007 Wiley Periodicals, Inc.
Additional Information
How to Cite
Kolen, A. W.J., Lenstra, J. K., Papadimitriou, C. H. and Spieksma, F. C.R. (2007), Interval scheduling: A survey. Naval Research Logistics, 54: 530–543. doi: 10.1002/nav.20231
Publication History
- Issue published online: 2 JUL 2007
- Article first published online: 16 MAR 2007
- Manuscript Accepted: 27 JAN 2007
- Manuscript Revised: 26 JAN 2007
- Manuscript Received: 13 SEP 2005
- Abstract
- References
- Cited By
Cited in:
- CrossRef
This article has been cited by:
- 1, , , Algorithms for large scale Shift Minimisation Personnel Task Scheduling Problems, European Journal of Operational Research, 2012, 219, 1, 34
- 2, , , , , Association control algorithms for handoff frequency minimization in mobile wireless networks, Wireless Networks, 2012,
- 3, , , , , Improving fleet utilization for carriers by interval scheduling, European Journal of Operational Research, 2012, 218, 1, 261
- 4, , , Modeling a hotel room assignment problem, Journal of Revenue and Pricing Management, 2012,
- 5, , Heuristics for operational fixed job scheduling problems with working and spread time constraints, International Journal of Production Economics, 2011, 132, 1, 107
- 6, , , Interval scheduling on related machines, Computers & Operations Research, 2011, 38, 12, 1836
- 7, , On the complexity of interval scheduling with a resource constraint, Theoretical Computer Science, 2011, 412, 29, 3650
- 8, , , , , , , Vyacheslav Tanaev: contributions to scheduling and related areas, Journal of Scheduling, 2011, 15, 4, 403
- 9, , Improved randomized results for the interval selection problem, Theoretical Computer Science, 2010, 411, 34-36, 3129
- 10, , , Resource allocation with time intervals, Theoretical Computer Science, 2010, 411, 49, 4217
- 11, , Working time constraints in operational fixed job scheduling, International Journal of Production Research, 2010, 48, 21, 6211
- 12, , , A vehicle scheduling problem with fixed trips and time limitations, International Journal of Production Economics, 2009, 117, 1, 150
- 13, , , Operational variable job scheduling with eligibility constraints: A randomized constraintâgraphâbased approach, Technological and Economic Development of Economy, 2009, 15, 2, 245
- 14, , , A solution method for a car fleet management problem with maintenance constraints, Journal of Heuristics, 2008, 15, 5, 425
- 15, , , Scaffolding and validation of bacterial genome assemblies using optical restriction maps, Bioinformatics, 2008, 24, 10, 1229

1520-6750/asset/NAV_left.gif?v=1&s=23e2ded0809abfc3ed47247eefb801bfed0ff239)
