SEARCH

SEARCH BY CITATION

Cited in:

CrossRef

This article has been cited by:

  1. 1
    Vincent Boyer, Bernard Gendron, Louis-Martin Rousseau, A branch-and-price algorithm for the multi-activity multi-task shift scheduling problem, Journal of Scheduling, 2014, 17, 2, 185

    CrossRef

  2. 2
    Sang Hwa Song, An integrated formulation for hierarchical cast design problems in the steel making industry, International Journal of Production Research, 2014, 52, 5, 1443

    CrossRef

  3. 3
    Xianhao Xu, Tian Liu, Kunpeng Li, Weihong Dong, Evaluating order throughput time with variable time window batching, International Journal of Production Research, 2014, 52, 8, 2232

    CrossRef

  4. 4
    Lixin Tang, Gongshu Wang, Zhi-Long Chen, Integrated Charge Batching and Casting Width Selection at Baosteel, Operations Research, 2014, 62, 4, 772

    CrossRef

  5. 5
    Racem Mellouli, Imed Kacem, Chérif Sadfi, Chengbin Chu, Lagrangian relaxation and column generation-based lower bounds for the <mml:math altimg="si67.gif" overflow="scroll" xmlns:xocs="http://www.elsevier.com/xml/xocs/dtd" xmlns:xs="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.elsevier.com/xml/ja/dtd" xmlns:ja="http://www.elsevier.com/xml/ja/dtd" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:tb="http://www.elsevier.com/xml/common/table/dtd" xmlns:sb="http://www.elsevier.com/xml/common/struct-bib/dtd" xmlns:ce="http://www.elsevier.com/xml/common/dtd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:cals="http://www.elsevier.com/xml/common/cals/dtd" xmlns:sa="http://www.elsevier.com/xml/common/struct-aff/dtd"><mml:mrow><mml:mi mathvariant="italic">Pm</mml:mi><mml:mtext>,</mml:mtext><mml:msub><mml:mrow><mml:mi>h</mml:mi></mml:mrow><mml:mrow><mml:mi>j</mml:mi><mml:mn>1</mml:mn></mml:mrow></mml:msub><mml:mo stretchy="false">‖</mml:mo><mml:mo>∑</mml:mo><mml:msub><mml:mrow><mml:mi>w</mml:mi></mml:mrow><mml:mrow><mml:mi>i</mml:mi></mml:mrow></mml:msub><mml:msub><mml:mrow><mml:mi>C</mml:mi></mml:mrow><mml:mrow><mml:mi>i</mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math> scheduling problem, Applied Mathematics and Computation, 2013, 219, 22, 10783

    CrossRef

  6. 6
    Jie Li, Xin Xiao, Qiuhua Tang, Christodoulos A. Floudas, Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process via Unit-Specific Event-Based Continuous-Time Models: Short-Term and Medium-Term Scheduling, Industrial & Engineering Chemistry Research, 2012, 51, 21, 7300

    CrossRef