Naval Research Logistics (NRL)

Cover image for Vol. 51 Issue 3

April 2004

Volume 51, Issue 3

Pages 307–465

    1. An FPTAS for scheduling a two-machine flowshop with one unavailability interval (pages 307–315)

      C.T. Ng and Mikhail Y. Kovalyov

      Article first published online: 8 DEC 2003 | DOI: 10.1002/nav.10107

    2. Two-dimensional failure modeling with minimal repair (pages 345–362)

      J. Baik, D.N.P. Murthy and N. Jack

      Article first published online: 30 DEC 2003 | DOI: 10.1002/nav.10120

    3. Resource allocation with lumpy demand: To speed or not to speed? (pages 363–385)

      Bintong Chen and Charles L. Munson

      Article first published online: 4 FEB 2004 | DOI: 10.1002/nav.10121

    4. Crane scheduling with spatial constraints (pages 386–406)

      Andrew Lim, Brian Rodrigues, Fei Xiao and Yi Zhu

      Article first published online: 23 FEB 2004 | DOI: 10.1002/nav.10123

    5. Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs (pages 407–445)

      Kerem Bülbül, Philip Kaminsky and Candace Yano

      Article first published online: 4 FEB 2004 | DOI: 10.1002/nav.20000

    6. A balancing problem for mixed model assembly lines with a paced moving conveyor (pages 446–464)

      Xiaobo Zhao, Katsuhisa Ohno and Hon-Shiang Lau

      Article first published online: 9 FEB 2004 | DOI: 10.1002/nav.10116

  1. Erratum

    1. Top of page
    2. Erratum
    1. You have free access to this content
      Erratum (page 465)

      Article first published online: 25 FEB 2004 | DOI: 10.1002/nav.20018

SEARCH

SEARCH BY CITATION