SEARCH

SEARCH BY CITATION

References

  • Association for Project Management (APM). (2006). APM body of knowledge (5th ed.). Buckinghamshire, UK: Author.
  • Besner, C., & Hobbs, B. (2006). The project management tools and techniques: The portrait of current professional practice. Project Management Journal, 37(3), 3748.
  • Besner, C., & Hobbs, B. (2008a). Discriminating contexts and project management best practices on innovative and non-innovative projects. Project Management Journal, 39(Special PMI Research Conference 2008 Edition), S123S135.
  • Besner, C., & Hobbs, B. (2008b). Project management practice, generic or contextual: A reality check. Project Management Journal, 39(1), 1633.
  • Besner, C., & Hobbs, B. (2012). An empirical identification of project management toolsets and a comparison among project types. Project Management Journal, 43(5), 2446.
  • Best practices. (2011). In Wikipedia. Retrieved from http://en.wikipedia.org/wiki/Best_practices
  • Brady, M. K., & Cronin, J. J., Jr. (2001). Some new thoughts on conceptualizing perceived service quality: A hierarchical approach. Journal of Marketing, 37(3), 3449.
  • Chapman, C. (2006). Key points of contention in framing assumptions for risk and uncertainty management. International Journal of Project Management, 24(4), 303313.
  • Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (2004). Benchmarking best NPD practices—I. Research Technology Management, 47(1), 3143.
  • Delisle, C. L., & Olson, D. (2004). Would the real project management language please stand up? International Journal of Project Management, 22(4), 327337. doi: 10.1016/s0263-7863(03)00072-3
  • Fornell, C., & Larcker, D. F. (1981). Evaluating structural equation models with unobservable variables and measurement error. Journal of Marketing Research, 18(1), 3950.
  • Frame, J. D. (1999). Building project management competence. San Francisco, CA: Jossey-Bass.
  • Hair, J. F., Anderson, R. E., Tatham, R.L., & Black, W. C. (1998). Multivariate data analysis (5th ed.). Upper Saddle River, NJ: Prentice Hall.
  • Hargrave, B. L., & Singley, J. (1998). PMBOK: A guide for project management in the next century. In Proceedings of the 29th Annual PMI Seminars and Symposiums, Long Beach, CA (on CD-ROM). Newtown Square, PA: Project Management Institute.
  • Hartman, F., & Skulmoski, G. (1998). Project management maturity. Project Management, 4(1), 7478.
  • McMahon, P., & Lane, J. D. (2001). Quality tools/techniques and the project manager. In Proceedings of the 33rd Annual PMI Seminars and Symposiums, Nashville, TN (on CD-ROM). Newtown Square, PA: Project Management Institute.
  • Milosevic, D. (2003). Project management toolbox: Tools and techniques for the practicing project manager. Hoboken, NJ: Wiley.
  • Papke-Shields, K. E., Beise, C., & Quan, J. (2010). Do project managers practice what they preach, and does it make a difference to project success? International Journal of Project Management, 28(7), 650662.
  • Pinto, J. K., & Covin, J. G. (1989). Critical factors in project implementation: A comparison of construction and R&D projects. Technovation, 9(1), 4962.
  • Pinto, J. K., & Slevin, D. P. (1987). Critical factors in successful project management. IEEE Transactions on Engineering Management, 34(1), 2227.
  • Project Management Institute (PMI). (2008a). A guide to the project management body of knowledge (PMBOK® guide; 4th ed.). Newtown Square, PA: Author.
  • Project Management Institute (PMI). (2008b). Organizational project management maturity model (OPM3; 2nd ed.). Newtown Square, PA: Author.
  • Project Management Institute (PMI). (2008c). Government extension to PMBOK® guide (3rd ed.). Newtown Square, PA: Author.
  • Raz, T., & Michael, E. (2001). Use and benefits of tools for project risk management. International Journal of Project Management, 19(1), 917.
  • Skulmoski, G. (2001). Project maturity and competence interface. Cost Engineering, 43(6), 1118.
  • SPSS. (2001). The SPSS two-step cluster component: Technical report. Available from http://www.spss.ch/upload/1122644952_The%20SPSS%20TwoStep%20Cluster%20Component.pdf
  • Thamhain, H. J. (1998). Integrating project management tools with the project team. In Proceedings of the 29th Annual PMI Seminars and Symposiums, Long Beach, CA (on CD-ROM). Newtown Square, PA: Project Management Institute.
  • Thomas, J., & Mullaly, M. (2008). Researching the value of project management. Project Management Journal, 38(3), 7488.
  • White, D., & Fortune, J. (2002). Current practice in project management—An empirical study. International Journal of Project Management, 20(1), 111.
  • Wideman, M. (2006). Comprehensive glossary of project management terms. Retrieved from http://www.pmforum.org/library/glossary/index.htm-Index_Section
  • Williams, T. (2007). Post project reviews to gain effective lessons learned. Newtown Square, PA: Project Management Institute.
  • Winch, G. M., & Kelsey, J. (2005). What do construction project planners do? International Journal of Project Management, 23(2), 141149.
  • Yang, L.-R., O'Connor, J. T., & Wang, C.-C. (2006). Technology utilization on different sizes of projects and associated impacts on composite project success. International Journal of Project Management, 24(2), 96105.
  • Zeitoun, A. (1998). Raising the bar in project management awareness and application. In Proceedings of the 31st Annual PMI Seminars and Symposiums, Houston, TX (on CD-ROM). Newtown Square, PA: Project Management Institute.
  • Zwikael, O. (2009). The relative importance of the PMBOK's nine knowledge areas during project planning. Project Management Journal, 40(4), 94103.
  • Zwikael, O., & Globerson, S. (2006). From critical success factors to critical success processes. International Journal of Production Research, 44(17), 34333449.