SEARCH

SEARCH BY CITATION

References

  • Anbari, F. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 1223.
  • Brockwell, P., & Davis, R. (2002). Introduction to time series and forecasting (2nd ed.). New York, NY: Springer.
  • Caron, F., Cagno, E., Mancini, M., Palomo, J., Rios Insua, D., & Ruggeri, F. (2006). On Bayesian forecasting of procurement delays: A case study. Applied Stochastic Models in Business and Industry, 22(2), 181192.
  • Christensen, D. (1993). Determining an accurate estimate at completion. National Contract Management Journal, 25(1), 1725.
  • Christensen, D. (1996, Spring). Project advocacy and the estimate at completion problem. Journal of Cost Analysis and Management, pp. 3560. Retrieved from http://www.suu.edu/faculty/christensend/ev-bib.html
  • Congdon, P. (2003). Applied Bayesian modeling. Hoboken, NJ: Wiley.
  • D'Agostini, G. (2003). Bayesian reasoning in data analysis: A critical introduction. London, UK: World Scientific Publishing Company.
  • De Finetti, B. (1974). Theory of probability. New York, NY: Wiley.
  • Fleming, Q. (1992). Cost/schedule control systems criteria: The management guide to C/SCSC. Chicago, IL: Probus.
  • Flyvberg, B. (2006). From Nobel Prize to project management: Getting risk right. Project Management Journal, 37(3), 515.
  • Gajoni, E., Dey, D., & Ruggeri, F. (2010). Bayesian modeling of flash floods using generalized extreme value distribution with prior elicitation. Chilean Journal of Statistics, 1(1), 7592.
  • Gamerman, D., & Freitas Lopes, H. (2006). Markov Chain Monte Carlo: Stochastic simulation for Bayesian inference (2nd ed.). London, UK: Chapman & Hall/CRC.
  • Kliem, R., & Ludin, I. (1998). Project management practitioner's handbook. New York, NY: AMACOM.
  • Lipke, W. (2003, Summer). Schedule is different. The Measurable News, pp. 31–34.
  • Lipke, W. (2002a, December). A study of the normality of earned value management indicators. The Measurable News, pp. 1–16.
  • Lipke, W. (2002b). Statistical process control of project performance. Crosstalk—The Journal of Defense Software Engineering, 13(6), 1620.
  • Lipke, W. (2006a, September). Earned schedule leads to improved forecasting. Proceedings of the 3rd international conference on project management (PROMAC 2006). Retrieved from http://www.earnedschedule.com/Docs
  • Lipke, W. (2006b, Winter). Statistical methods applied to EVM … the next frontier. The Measurable News, pp. 18–30.
  • Marshall, R. A., Ruiz, P., & Bredillet, C. N. (2008). Earned value management insights using inferential statistics. International Journal of Managing Projects in Business, 1(2), 288294.
  • O'Hagan, A., Buck, C. E., Daneshkhah, A., Eiser, J. R., Garthwaite, P. H., Jenkinson, D. J., … Rakow, T. (2006). Uncertain judgements: Eliciting experts' probabilities. Chichester, UK: Wiley.
  • Project Management Institute. (2008). A guide to the project management body of knowledge (PMBOK® guide; 4th ed.). Newtown Square, PA: Author.
  • Project Management Institute. (2011). Practice standard for earned value management. Newtown Square, PA: Author.
  • Spetzler, C. S., & Staël von Holstein, C. A. S. (1975). Probability encoding in decision analysis. Management Science, 22(3), 340358.