Paper
You have free access to this content
A Bayesian Approach to Improve Estimate at Completion in Earned Value Management
Article first published online: 28 DEC 2012
DOI: 10.1002/pmj.21303
© 2012 Project Management Institute
Additional Information
How to Cite
Caron, F., Ruggeri, F. and Merli, A. (2013), A Bayesian Approach to Improve Estimate at Completion in Earned Value Management. Proj Mgmt Jrnl, 44: 3–16. doi: 10.1002/pmj.21303
Publication History
- Issue published online: 18 JAN 2013
- Article first published online: 28 DEC 2012
References
- (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12–23.
- , & (2002). Introduction to time series and forecasting (2nd ed.). New York, NY: Springer.
- , , , , , & (2006). On Bayesian forecasting of procurement delays: A case study. Applied Stochastic Models in Business and Industry, 22(2), 181–192.
- (1993). Determining an accurate estimate at completion. National Contract Management Journal, 25(1), 17–25.
- (1996, Spring). Project advocacy and the estimate at completion problem. Journal of Cost Analysis and Management, pp. 35–60. Retrieved from http://www.suu.edu/faculty/christensend/ev-bib.html
- (2003). Applied Bayesian modeling. Hoboken, NJ: Wiley.
- (2003). Bayesian reasoning in data analysis: A critical introduction. London, UK: World Scientific Publishing Company.
- (1974). Theory of probability. New York, NY: Wiley.
- (1992). Cost/schedule control systems criteria: The management guide to C/SCSC. Chicago, IL: Probus.
- (2006). From Nobel Prize to project management: Getting risk right. Project Management Journal, 37(3), 5–15.
- , , & (2010). Bayesian modeling of flash floods using generalized extreme value distribution with prior elicitation. Chilean Journal of Statistics, 1(1), 75–92.
- , & (2006). Markov Chain Monte Carlo: Stochastic simulation for Bayesian inference (2nd ed.). London, UK: Chapman & Hall/CRC.
- , & (1998). Project management practitioner's handbook. New York, NY: AMACOM.
- (2003, Summer). Schedule is different. The Measurable News, pp. 31–34.
- (2002a, December). A study of the normality of earned value management indicators. The Measurable News, pp. 1–16.
- (2002b). Statistical process control of project performance. Crosstalk—The Journal of Defense Software Engineering, 13(6), 16–20.
- (2006a, September). Earned schedule leads to improved forecasting. Proceedings of the 3rd international conference on project management (PROMAC 2006). Retrieved from http://www.earnedschedule.com/Docs
- (2006b, Winter). Statistical methods applied to EVM … the next frontier. The Measurable News, pp. 18–30.
- , , & (2008). Earned value management insights using inferential statistics. International Journal of Managing Projects in Business, 1(2), 288–294.
- , , , , , , … (2006). Uncertain judgements: Eliciting experts' probabilities. Chichester, UK: Wiley.
- Project Management Institute. (2008). A guide to the project management body of knowledge (PMBOK® guide; 4th ed.). Newtown Square, PA: Author.
- Project Management Institute. (2011). Practice standard for earned value management. Newtown Square, PA: Author.
- , & (1975). Probability encoding in decision analysis. Management Science, 22(3), 340–358.

1938-9507/asset/PMJ_left.gif?v=1&s=58dbd028626d3fdc6853cbbf348850203fbdae5f)
1938-9507/asset/PMJ_right.gif?v=1&s=7a4f61b78122ee0944740c6da650de9fafeb57f5)
