Baseline risk assessment tool: A comprehensive risk management tool for process safety
Article first published online: 14 JUL 2011
DOI: 10.1002/prs.10464
Copyright © 2011 American Institute of Chemical Engineers (AIChE)
Additional Information
How to Cite
Cherubin, P., Pellino, S. and Petrone, A. (2011), Baseline risk assessment tool: A comprehensive risk management tool for process safety. Proc. Safety Prog., 30: 251–260. doi: 10.1002/prs.10464
Publication History
- Issue published online: 5 AUG 2011
- Article first published online: 14 JUL 2011
- Abstract
- Article
- References
- Cited By
Keywords:
- risk assessment;
- barrier;
- incident;
- bow-tie;
- top event;
- process safety
Abstract
Large losses are typically the result of the failure of multiple safety barriers, often within complex scenarios. An innovative methodology accompanied by a dedicated software baseline risk assessment tool (BART) has been set up to cover all types of onshore and offshore installations and to allow any exploration and production organization to monitor all of its assets' status with a common and standardized approach. The BART tool combines a simplified quantitative risk assessment methodology with a bow-tie model approach to identify and assess potential hazards and associated risks, that may arise from a process or activity carried out in an upstream onshore/offshore installation. The event sequence of any major incident is analyzed from the identification of primary root causes up to the determination of potential effects and associated impacts. Therefore, all existent safety barriers are identified and their prevention and mitigation risk reduction contributions are included in the analysis. The BART tool allows for a systematic monitoring of all major incident risks through the selection of effective control measures able to reduce the likelihood and/or to limit the potential effects of current risks. The BART methodology has been tested on some existing onshore and offshore oil and gas installations, and the main findings have been positively compared with alternative approaches. © 2011 American Institute of Chemical Engineers Process Saf Prog, 2011

1547-5913/asset/PRS_left.gif?v=1&s=eec397d21f5de7c3ba50a866c28a6ea0caff404d)
1547-5913/asset/olbannercenter.gif?v=1&s=f18d7f26479b19745893996bf9374eef1f4cad3c)
1547-5913/asset/PRS_right.gif?v=1&s=e540b85b3f450889df2a9637783b5c62856f00a0)