Process Safety Progress

Cover image for Process Safety Progress

September 2002

Volume 21, Issue 3

Pages fmi–fmi, S2–S2, 171–267

  1. Masthead

    1. Top of page
    2. Masthead
    3. Errata
    4. Feature Articles
    1. Masthead (page fmi)

      Version of Record online: 16 APR 2004 | DOI: 10.1002/prs.680210301

  2. Errata

    1. Top of page
    2. Masthead
    3. Errata
    4. Feature Articles
    1. You have free access to this content
      Errata (page S2)

      Version of Record online: 16 APR 2004 | DOI: 10.1002/prs.680210302

  3. Feature Articles

    1. Top of page
    2. Masthead
    3. Errata
    4. Feature Articles
    1. Charge generation during filling of insulated tanks (pages 181–184)

      Migvia Vidal, John P. Wagner, William J. Rogers and M. Sam Mannan

      Version of Record online: 16 APR 2004 | DOI: 10.1002/prs.680210304

    2. Retrofit experiences with a 32-year-old ammonia plant (pages 185–203)

      Ved Gupta and Brennan Borserio

      Version of Record online: 16 APR 2004 | DOI: 10.1002/prs.680210305

    3. Fire in secondary reformer outlet line to waste heat boiler (pages 205–211)

      Jagmohan Singh, P. Basu and B. M. Rao

      Version of Record online: 16 APR 2004 | DOI: 10.1002/prs.680210306

    4. Fire tests to study the effect of pressure relief valve blowdown on the survivability of propane tanks in fires (pages 227–236)

      A. Michael Birk, Jonathan D. J. Vandersteen, M. H. Cunningham, C. R. Davison and I. Mirzazadeh

      Version of Record online: 16 APR 2004 | DOI: 10.1002/prs.680210308

    5. Study of major accidents and lessons learned (pages 237–244)

      S. G. Balasubramanian and Joseph F. Louvar

      Version of Record online: 16 APR 2004 | DOI: 10.1002/prs.680210309

SEARCH

SEARCH BY CITATION