Plant/Operations Progress

Cover image for Plant/Operations Progress

July 1986

Volume 5, Issue 3

Pages fmi–fmi, J2–J6, 129–191

Currently known as: Process Safety Progress

  1. Masthead

    1. Top of page
    2. Masthead
    3. Plant/Operations shorts
    4. Letters
    5. Articles
    6. Safety and Health Division News
    1. Masthead (page fmi)

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050301

  2. Plant/Operations shorts

    1. Top of page
    2. Masthead
    3. Plant/Operations shorts
    4. Letters
    5. Articles
    6. Safety and Health Division News
    1. Plant/operations shorts (pages J2–J3)

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050302

  3. Letters

    1. Top of page
    2. Masthead
    3. Plant/Operations shorts
    4. Letters
    5. Articles
    6. Safety and Health Division News
    1. Letters (page J3)

      Thomas Maguire

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050303

  4. Articles

    1. Top of page
    2. Masthead
    3. Plant/Operations shorts
    4. Letters
    5. Articles
    6. Safety and Health Division News
    1. Modification chains (pages 136–141)

      Trevor A. Kletz

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050305

    2. Thermal runaways: Problems with agitation (pages 142–147)

      E. D. Weir, G. W. Gravenstine and T. F. Hoppe

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050306

    3. High temperature polymeric fire barriers (pages 148–154)

      C. T. Jacobsen

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050307

    4. Failure of high pressure synthesis pipe (pages 155–159)

      G. R. Prescott, P. Blommaert and L. Grisolia

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050308

    5. Transportation of Hazardous substances: The UK scene (pages 160–164)

      Trevor A. Kletz

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050309

    6. Major fire in a steam-methane reformer furnace (pages 165–168)

      C. S. McCoy, M. D. Dillenback and D. J. Truax

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050310

    7. Mitigation of vapor cloud hazards (pages 169–174)

      Richard W. Prugh

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050311

    8. Multiple cracking and leakage of a hot synthesis gas pipe (pages 175–178)

      Garth M. Lawrence

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050312

    9. Loss prevention through machinery vibration surveillance and analysis (pages 179–182)

      Ronald W. LeBlanc

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050313

    10. Boiler and machinery protection through control of piping reactions (pages 183–185)

      D. E. Hansen

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050314

    11. Lessons in hazardous material transportation based on case histories (pages 186–191)

      Gerard A. Gallagher and Scott W. McCone

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050315

  5. Safety and Health Division News

    1. Top of page
    2. Masthead
    3. Plant/Operations shorts
    4. Letters
    5. Articles
    6. Safety and Health Division News
    1. Safety and health division news (pages J5–J6)

      Article first published online: 17 JUN 2004 | DOI: 10.1002/prsb.720050316

SEARCH

SEARCH BY CITATION