SEARCH

SEARCH BY CITATION

REFERENCES

  • 1
    Ausin JC. The impact of a large penetration of intermittent sources on the power system operation and planning. PhD submitted to The University of Manchester (UMIST), 2005.
  • 2
    E.ON Netz GmbH. Netzanschlussregeln für Hoch und Höchstspannung, Bayreuth 1, August 2006.
  • 3
    Bolik S, Andresen B, Birk J, Nielsen J. Vestas handles grid code requirements. Advanced control strategies for wind turbines, EWEC Madrid, 2003.
  • 4
    Requisitos de respuesta frente a huecos de tensión de las instalaciones eólicas REE”, PO.12.3, REE draft document, January 2006.
  • 5
    Navarro Gevers D. Beitrag zur Regelung einer doppeltgespeisten Asynchronmaschine für Windkraftanlagen ohne Lagegeber. PhD submitted to T.U.Ilmenau, 2004.
  • 6
    IEC 61400–21 Ed 2.0. Wind turbine generator systems—Part 21: measurement and assessment of power quality characteristics of grid connected turbines. Committee draft (CDV), February 2007.
  • 7
    Technische Richtlinien für Windkraftanlagen, Teil 4-Bestimmung der Elektrischen Eigenschaften Fördergesellschaft für Windenergie e.V (FGW), 2. Revision 20, January 2006.
  • 8
    Procedimiento de verificación, validación y certificación de los requisitos del PO 12.3 sobre la respuesta de las instalaciones eólicas ante huecos de tensión”. AEE draft document, January 2007.
  • 9
    RTC Test Unit, Manual V07. FeCon GmbH. Flensburg, 2006.
  • 10
    Ekanayake JB, Holdsworth L, Jenkins N. Comparison of 5th and 3rd Order Machine Models for Doubly Fed Induction Generator (DFIG) Wind Turbines. Elsevier Power Systems Research 2003, 67(3): 207215.
  • 11
    Erlich I.Modelling of Wind Turbines Equipped with Doubly-Fed Induction Machines for Power System Stability Studies”, PSCE 2006, IEEE.