SEARCH

SEARCH BY CITATION

Movie S1: progression of the precipitation front. Four TollN6-VLR capillaries were set up with reservoirs either of 3.4 M sodium malonate pH 7.0 (two capillaries on the left) or 0.15M I3C, 2.89M sodium malonate pH 7.0 (two capillaries on the right). A picture was taken every hour over ten days. A movie was generated with 24 frames per second. The progression of the precipitation front is clearly visible in the second capillary from the left. DOI: 10.1107/S0021889812051606/he5568sup1.mov

Please note: Wiley Blackwell is not responsible for the content or functionality of any supporting information supplied by the authors. Any queries (other than missing content) should be directed to the corresponding author for the article.