Engineering Construction and Architectural Management

Cover image for Engineering Construction and Architectural Management

August 2002

Volume 9, Issue 4

Pages 293–365

  1. Editorial

    1. Top of page
    2. Editorial
    3. Original Articles
    4. Book Reviews
    5. Erratum
    1. Editor's Introduction (page 293)

      Version of Record online: 26 JUL 2002 | DOI: 10.1046/j.1365-232X.2002.00269.x

  2. Original Articles

    1. Top of page
    2. Editorial
    3. Original Articles
    4. Book Reviews
    5. Erratum
    1. Triangulation in construction management research (pages 294–303)

      Peter E. D. Love, Gary D. Holt and Heng Li

      Version of Record online: 26 JUL 2002 | DOI: 10.1046/j.1365-232X.2002.00226.x

    2. Automated excavation in construction using robotics trajectory and envelop generation (pages 325–335)

      Fuad Mrad, M. Asem Abdul-Malak, Salah Sadek and Ziad Khudr

      Version of Record online: 26 JUL 2002 | DOI: 10.1046/j.1365-232X.2002.00247.x

  3. Book Reviews

    1. Top of page
    2. Editorial
    3. Original Articles
    4. Book Reviews
    5. Erratum
  4. Erratum

    1. Top of page
    2. Editorial
    3. Original Articles
    4. Book Reviews
    5. Erratum
    1. Erratum (page 365)

      Version of Record online: 26 JUL 2002 | DOI: 10.1046/j.1365-232X.2002.t01-1-00271.x

SEARCH

SEARCH BY CITATION