SEARCH

SEARCH BY CITATION

Figure S1. Water potential measurements (mean±S.E.) in control (circle), watered (triangle), and drought (square) plots, summer and fall 2009. A total of 10 probes (2 per block, top 5 cm) were located in each treatment. Dashed lines delimit the summer drought period (July 1–Aug 31), and ‘W’ symbols indicated days where water was added to watered treatments. Inset shows the water retention curve relating site volumetric water content (%) to potential, measured in control, watered, and droughted plots in August and September 2009.

Please note: Wiley-Blackwell is not responsible for the content or functionality of any supporting materials supplied by the authors. Any queries (other than missing material) should be directed to the corresponding author for the article.

FilenameFormatSizeDescription
GCB_2347_sm_fig-s1.tif275KSupporting info item

Please note: Wiley Blackwell is not responsible for the content or functionality of any supporting information supplied by the authors. Any queries (other than missing content) should be directed to the corresponding author for the article.