Figure S1. Time schedule of the construction of Nysted Offshore Wind Farm. The construction of Nysted Offshore Wind Farm was separated into two major phases. The first phase included preparations for the actual construction work, such as excavation for the foundations, digging of cable furrows and a single case of seabed securing with steel sheet piles. The second phase included cabling and the wind turbine construction. Each of the two phases was divided into several activities scheduled as shown in the figure. The construction work began 20 June with excavation for foundations. The last wind turbine was mounted 27 July 2003 and the park was in full operation 1 December 2003.

Please note: Wiley-Blackwell are not responsible for the content or functionality of any supporting materials supplied by the authors. Any queries (other than missing material) should be directed to the corresponding author for the article.

FilenameFormatSizeDescription
MMS_364_sm_FigS1.pdf13KSupporting info item

Please note: Wiley Blackwell is not responsible for the content or functionality of any supporting information supplied by the authors. Any queries (other than missing content) should be directed to the corresponding author for the article.