Abstract

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited

Abstract:  Streambank erosion by mass-failure processes represents an important form of channel adjustment and a significant source of sediment in disturbed streams. Mass failures regularly occur by a combination of hydraulic processes that undercut bank toes and geotechnical processes that cause bank collapse by gravity. Little if any quantitative information is available on the effectiveness of bank treatments on reducing erosion. To evaluate potential reduction in sediment loadings emanating from streambanks, the hydraulic and geotechnical processes responsible for mass failure were simulated under existing and mitigated conditions using a Bank-Stability and Toe-Erosion Model (BSTEM). Two critical erosion sites were selected from each of the three watersheds known to contribute the greatest amounts of fine sediment by streambank processes in the Lake Tahoe Basin. A typical high-flow annual hydrograph was selected for analysis. Bank-material strength data were collected for each layer as were species-specific root-reinforcement values. The effects of the first flow event on bank-toe erosion were simulated using an excess shear-stress approach. The resulting geometry was then exported into the bank-stability submodel to test for the relative stability of the bank under peak flow and drawdown conditions. In this way, BSTEM was used iteratively for all flow events for both existing and mitigated conditions. On average, 13.6% of the material was eroded by hydraulic shear, the remainder by mass failures, which occurred about five times over the simulation period. Simulations with 1.0 m-high rock-toe protection showed a dramatic reduction in streambank erosion (69-100%). Failure frequency for the simulation period was reduced in most cases to a single episode. Thus, an almost 90% reduction in streambank loadings was achieved by virtually eliminating the erosion of only 14% of the material that was entrained by hydraulic forces. Consequently, simulations show average load reductions of about an order of magnitude. Results stress the critical importance of protecting the bank toe-region from steepening by hydraulic forces that would otherwise entrain previously failed and in situ bank materials, thereby allowing the upper bank to flatten (by failure) to a stable slope.


Introduction

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited

The Lake Tahoe Basin has a long history of human interaction and exploitation dating back to the 1850s. Activities such as logging, road construction, mining, overgrazing, and urbanization have led to degradation of land and water resources, and threaten to do irreparable damage to the lake. In particular are concerns for lake-water clarity, which have largely been attributed to the delivery of algae and fine-grained mineral sediment emanating from upland, urban, and channel sources. Over the past 35 years, a trend of decreasing water clarity, as measured by secchi depth has been documented (Goldman, 1988; Jassby et al., 1999; Murphy, 2000; Reuter and Miller, 2000).

As lake clarity is related to the very fine particles that remain in suspension and that transport adsorbed constituents (such as phosphorus), it is essential to identify the magnitude and sources of these fine-grained materials to effectively simulate current and future water-clarity conditions in Lake Tahoe using a lake-clarity model. Furthermore, selection of appropriate management strategies must be founded on the identification of the controlling processes and associated source areas of fine sediment. In the Lake Tahoe Basin, these source areas can be broadly separated into uplands, urban areas, and channels. More specifically, upland sources may include slopes, fields, roads, construction-site gullies, etc., while channel sources may include channel beds, bars, and streambanks. The magnitude of sediment production, transport, and delivery to the lake varies widely across the basin as a function of differences in precipitation, surficial geology, land use/land cover, and channel instabilities. A compounding problem to lake clarity is the role of nutrients, particularly phosphorus, that stimulate biologic activity leading to algal blooms. Algal growth in the lake has increased steadily (about sixfold) from the late 1950s to present (Reuter and Miller, 2000).

A number of studies have been completed in the past 30 years to address sediment delivery issues from various watersheds in the Lake Tahoe Basin. Earlier studies each focused on only a few streams within the watershed (Kroll, 1976; Glancy, 1988; Nolan and Hill, 1991; Stubblefield, 2002). More recent work by Reuter and Miller (2000), Rowe et al. (2002), Simon et al. (2003), and Simon (2008) used suspended-sediment transport data from the Lake Tahoe Interagency Monitoring Program (LTIMP), which brought together data from streams all around the watershed. These works have indicated that the following streams are among the largest contributors of suspended sediment to Lake Tahoe: Incline, Third, Blackwood, and Ward Creeks, and the Upper Truckee River. Most of the sediment is delivered during the spring snowmelt period (predominantly May and June), which correlates well with the spring reduction in secchi depth.

Erosion from streambanks has been listed as a leading contributor of suspended solids in the Lake Tahoe Basin (Leonard et al., 1979; Hill and Nolan, 1990; USDA Forest Service, 1994). Simon (2008) estimated that about 25% of the median annual, fine-grained loading of sediment to the lake was derived from streambank erosion, making this an important source category. In fact, about 20% of all fine sediment delivered to Lake Tahoe was found to come from the banks of the Upper Truckee River and Blackwood Creek. If Ward Creek is also included, this value becomes 22%, with the remainder emanating from other watersheds around the lake (Figure 1).

image

Figure 1.  Unit Volume of Fine-Sediment (<0.063 mm) Contributions From Streambank Erosion Per Kilometer of Main Channels (left), and Median, Annual Loadings of Fine Sediment (<0.063 mm) From Streambank Erosion (right). Gray shading indicates no data available. Blackwood Creek, #62; Upper Truckee River, #44; Ward Creek, #63. Modified from Simon (2008).

Download figure to PowerPoint

To improve lake clarity, it is essential to quantify the magnitude of the load reductions that could be expected from streambank erosion and other source categories such as upland, airborne, urban, and shoreline. The research undertaken and described in this paper focuses on potential load reductions from streambank erosion and represents only one of numerous projects being conducted by academic institutions, government agencies, and private firms to improve knowledge about the magnitudes and potential reduction in fine-grained loadings for the various source categories. A synthesis of the products generated from all of this research and development of a load-reduction strategy for Lake Tahoe will rely heavily on numerical simulations of lake clarity being conducted by the University of California, Davis.

Bank retreat and the associated sediment loadings from streambank erosion highlight the importance of interactions between hydraulic forces acting at the bed and bank toe, and gravitational forces acting on in situ bank material (Carson and Kirkby, 1972; Thorne and Tovey, 1981; Simon et al., 1991). Failure occurs when erosion of the bank toe and the channel bed adjacent to the bank have increased the height and angle of the bank to the point that gravitational forces exceed the shear strength of the bank material. Failed bank materials may be delivered directly to the flow and deposited as bed material, dispersed as wash load, deposited along the toe of the bank as intact blocks, or as smaller, dispersed aggregates (Simon et al., 1991). If deposited at the bank toe, failed bank material may temporarily increase bank stability by buttressing the bank and protecting in situ bank material from entrainment by the flow. The properties of the failed bank material, in tandem with the hydraulic forces acting at the bank toe, control the residence time of failed bank material (Thorne, 1982).

To evaluate potential reduction in fine-sediment (silts and clays) loadings emanating from streambanks, it was necessary to analyze the discrete processes that control streambank erosion under existing and mitigated conditions. These can be described in terms of the controlling driving and resisting forces that affect steepening by hydraulic erosion and bank stability, that is controlled by gravity. These processes include hydraulic erosion of bank-toe sediments, mass failure of upper-bank materials and the reinforcing effects of vegetation, if present. All of these processes can be modeled using the Bank-Stability and Toe-Erosion Model (BSTEM) developed by Simon et al. (2000). The model has been previously used successfully in the Tahoe Basin to model the influence of riparian vegetation on bank stability along a reach of the Upper Truckee River (Simon et al., 2006).

Objectives and Approach

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited

The general research objective was to quantify fine-sediment loadings from streambank erosion for existing conditions and then investigate the potential reductions in loadings by simulating various mitigation techniques. To accomplish this, the following tasks were outlined:

  • 1
    Select critical erosion sites within watersheds known to produce substantial quantities of fine-sediment from streambank erosion processes.
  • 2
    Select a typical high-flow, annual hydrograph and discretize into a series of individual storm events.
  • 3
    Quantify the erosion caused by hydraulic forces at the bank toe and subsequent bank-failure by gravity for each storm in the annual series.
  • 4
    Quantify annual loadings from streambank erosion for existing conditions at these critical erosion sites by summing the amount of erosion for each storm event in the series.
  • 5
    Repeat the simulations for each storm using BSTEM for mitigated conditions, and calculate the total amount of erosion at these critical erosion sites by summing the values for each storm event; mitigation options modeled are shown in Table 1.
  • 6
    Calculate the differences in loadings under existing and mitigated bank conditions for the modeled sites.
  • 7
    Extrapolate results to the remainder of the main-stem channel system using field data on the longitudinal extent of recent bank failures.
  • 8
    Apply the results to an evaluation of the potential cost of load reductions using alternative strategies for mitigation.
Table 1.   Selected Treatment Options Represented in BSTEM Simulations.
Mitigation MeasureDescriptionRepresentation Within BSTEM
Bank Protection – stone toeRigid stabilization of bank toeModify physical properties of lower bank to reflect 256 mm boulders placed 1.0-1.5 m up the bank toe
Bank Strengthening – wet meadow vegetation Restore streambank vegetation herbaceous (via soil improvements, soil moisture increases) wet meadow “sod” growing on banksModify vegetation parameters to increase bank strength by root reinforcement in upper 0.5-1.0 m, but adjust for added weight (surcharge) if needed
Bank Strengthening – woody riparian vegetation Restore streambank vegetation woody (via soil improvements, soil moisture or stream dynamics-seed beds) Modify vegetation parameters to increase bank strength by root reinforcement in upper 0.5-1.0 m, but adjust for added weight (surcharge) if needed
Channel reconstruction/ channel restoration Restore natural geomorphic characteristics through construction. Restore sinuosity to channelized streams. Recreate hydrologic connectivity in streams, meadows, and wetlands Effects of increased sinuosity are simulated by reducing bed slope (based on concept designs for two proposed projects)

Bank Stability and Toe-Erosion Model

The original BSTEM model (Simon et al., 1991) allowed for five unique soil layers, accounted for pore-water pressures on both the saturated and unsaturated parts of the failure plane, and the confining pressure from streamflow. The enhanced BSTEM (Version 4.1) includes a submodel to predict bank-toe erosion and undercutting by hydraulic shear. This is based on an excess shear-stress approach that is linked to the geotechnical algorithms. Complex geometries resulting from simulated bank-toe erosion are used as the new input geometry for the geotechnical part of the bank-stability model. If a failure is simulated, that new bank geometry can be exported back into either submodel to simulate conditions over time by running the submodels iteratively with different flow and water-table conditions. In addition, the enhanced bank-stability submodel allows the user to select between cantilever and planar-failure modes and allows for inclusion of the mechanical, reinforcing effects of riparian vegetation (Micheli and Kirchner, 2002; Simon and Collison, 2002; Pollen and Simon, 2005).

Bank-Toe Erosion Submodel.  The bank-toe erosion submodel can be used to estimate erosion of bank and bank-toe materials by hydraulic shear stresses. The effects of toe protection can also be incorporated into the analysis by changing the characteristics of the toe material in the model. The model calculates an average boundary shear stress from channel geometry and flow parameters using a rectangular-shaped hydrograph defined by flow depth and the duration of the flow (steady, uniform flow). The assumption of steady, uniform flow is not critical insomuch as the model does not attempt to rout flow and sediment and is used only to establish the boundary shear stress for a specified duration along the bank surface. The model also allows for different critical shear stress and erodibility of separate zones with potentially different materials at the bank and bank toe. The bed elevation is fixed because the model does not incorporate the simulation of sediment transport.

Toe erosion by hydraulic shear is calculated using an excess shear approach. The average boundary shear stress (τo) acting on each node of the bank material is calculated using

  • image(1)

where τo is the average boundary shear stress (Pa), γw is the unit weight of water (9.81 kN/m3), R is the local hydraulic radius (m), and S is the channel slope (m/m).

The average boundary shear stress exerted by the flow on each node of the bank profile is determined by dividing the flow area at a cross-section into segments that are affected only by the roughness of the bank or bed and then further subdivided to determine the flow area affected by the roughness of each node. The line dividing the bed-affected and bank-affected segments is assumed to bisect the average bank angle and the average bank-toe angle (Figure 2). The hydraulic radius (R) of the flow on each segment is the area of the segment (A) divided by the wetted perimeter of the segment (Pn). Thus, the shear stress varies along the bank surface according to Equation (1) as parameters comprising the segmented areas change.

image

Figure 2.  Segmentation of Local Flow Areas and Hydraulic Radii. Oblique, dashed line furthest to the right divides the bed- and bank-affected segments. Simulated hydraulic erosion is shown as the dark hachured area.

Download figure to PowerPoint

An average erosion rate (in m/s) is computed for each node by utilizing an excess-shear stress approach (Partheniades, 1965). This rate is then integrated with respect to time to yield an average erosion distance in centimeters (Figure 2). This method is similar to that employed in the CONCEPTS model (Langendoen, 2000), except that erosion is assumed to occur normal to the local bank angle, and not horizontally:

  • image(2)

where E is the erosion distance (cm), k is the erodibility coefficient (cm3/N/s), Δt is the time step (s), τ0 is the average boundary shear stress (Pa), and τc is the critical shear stress (Pa).

Resistance of bank-toe and bank-surface materials to erosion by hydraulic shear is handled differently for cohesive and noncohesive materials. For cohesive materials the relation developed by Hanson and Simon (2001) using a submerged jet-test device (Hanson, 1990, 1991) is used

  • image(3)

The Shields (1936) criteria are used for resistance of noncohesive materials as a function of roughness and particle size (weight), and expressed in terms of a dimensionless critical shear stress

  • image(4)

where τ* is the critical dimensionless shear stress, ρs is the sediment density (kg/m3), ρw is the water density (kg/m3), g is the gravitational acceleration (m/s2), and D is the characteristic particle diameter (m).

Bank Stability Submodel.  The bank stability submodel combines three limit equilibrium-methods to calculate a Factor of Safety (Fs) for multi-layered streambanks. The methods simulated are horizontal layers (Simon and Curini, 1998; Simon et al., 2000), vertical slices for failures with a tension crack (Morgenstern and Price, 1965), and cantilever failures (Thorne and Tovey, 1981).

For planar failures without a tension crack, the Factor of Safety (Fs) for both the saturated and unsaturated parts of the failure plane is given by

  • image

where ci is the effective cohesion of ith layer (kPa), Li is the length of the failure plane incorporated within the ith layer (m), Si is the force produced by matric suction on the unsaturated part of the failure surface (kN/m), φb is the angle representing the rate of increase in shear strength with increasing matric suction (°), Wi is the weight of the ith layer (kN), Ui is the hydrostatic-uplift force on the saturated portion of the failure surface (kN/m), Pi is the hydrostatic-confining force due to external water level (kN/m), β is the failure-plane angle (degrees from horizontal), α is the bank angle (degrees from horizontal), φ′ is the angle of internal friction (o), and I is the number of layers.

For planar failures with a tension crack Fs is determined by the balance of forces in horizontal and vertical directions for each slice ( j) and in the horizontal direction for the entire failure block. Fs is given by:

  • image(6)

The cantilever shear failure algorithm is a further development of the method employed in the CONCEPTS model (Langendoen, 2000). The Fs is given by

  • image(7)

BSTEM can utilize any of the stability equations depending on the geometry and conditions of the bank or as specified by the user. Determining whether a failure is planar or cantilever is based on whether there is undercutting (allowing the use of the cantilever failure) and then comparing the factor of safety values. The failure mode is then determined by the smaller of the two values. The model is easily adapted to incorporate the effects of geotextiles or other bank stabilization measures that affect soil strength. This version (version 4.1) of the model assumes hydrostatic conditions below the water table. Matric suction above the water table (negative pore-water pressure) is calculated by linear interpolation as

  • image(8)

where μw is the pore-water pressure, γ is the unit weight of water (kN/m3), and h is the height above the water table (m).

Vegetation Effects.  The reinforcing effect of riparian vegetation was accounted for where applicable. In general, root reinforcement is limited to the upper 1.0 m of the bank based on field investigations of rooting depths (Simon and Collison, 2002). This was achieved by adding cohesion to the bank layers, where roots were observed to simulate the effect of root-reinforcement on streambank stability. These values can be significantly greater than the effective cohesion (c′) of the soil, particularly for mature trees. Root-reinforcement estimates were obtained using the RipRoot model (Pollen and Simon, 2005; Pollen, 2007), which takes into account a distribution of different diameter roots, with corresponding tensile strengths determined for each species, acting over a failure plane. RipRoot estimates the reinforcement provided by roots crossing the shear plane, based on an algorithm that allows progressive loading of the streambank, breaking of roots and associated redistribution of stresses as root breakage or pullout occurs (Pollen and Simon, 2005).

Site Selection

Critical erosion sites were selected from the three watersheds known to contribute the greatest amounts of fine sediment by streambank processes: Upper Truckee River, Blackwood Creek, and Ward Creek (Simon, 2008). Blackwood and Ward Creeks represent steep (0.008-0.03 m/m), coarse-bedded reaches (boulder/cobble) where 10-15 m-high terrace slopes sporadically abut the channel. Large-woody debris (LWD) is common in the channels, emanating from failed banks and re-distributed by flood flows. Flow deflection by the LWD causes accelerated lateral erosion of streambanks and results in increased sinuosity. The Upper Truckee River study reaches represent flatter (0.002 m/m), finer-grained (sand/gravel) reaches that meander through grassed meadows. LWD is present but not in the volumes as in Ward and Blackwood Creeks. A summary of site characteristics for the modeled streambanks is shown in Table 2, all of which have actively eroding streambanks.

Table 2.   General Site Characteristics for Modeled Streambanks.
StreamRiver Kilometer (rkm)Bank Height (m)Special Characteristics
Blackwood Creek1.943.0No top-bank vegetation
2.392.4Lemmon’s willow (moderate)
Upper Truckee River4.512.6Meadow vegetation
8.451.9Mixed meadow and woody vegetation
13.12.7Golf course with Lodgepole pine
Ward Creek2.4814.914.9 m steep, terrace slope adjacent to channel; coarse material at toe; mature conifers
3.601.3Meadow vegetation

Input Data.  BSTEM requires (1) data that quantify the driving and resisting forces for erosion by hydraulic shear and (2) geotechnical data that define the gravitational forces that control mass failure (Table 3). Geotechnical and hydraulic-resistance data were collected in 2002 along the Upper Truckee River and Ward Creek as part of an earlier study and supplemented with additional data on vegetation type and density along these streams, and along Blackwood Creek in 2006. Apparent cohesion (ca) and friction angle (φ′) of in situ bank sediments were obtained using a borehole shear test device (Handy and Fox, 1967; Luttenegger and Hallberg, 1981). Bulk unit weight (γs) was obtained from core samples of known volume that were processed (weighed) in the sediment laboratory at NSL. Pore-water pressure at the time of geotechnical testing was obtained with miniature, digital tensiometers and used to calculate effective cohesion (c′) using

  • image(9)

where μa and μw are the pore-air and pore-water pressure, respectively (kPa).

Table 3.   Summary of Input Requirements and Associated Symbols for BSTEM Simulations.
Submodel
Toe Erosion (hydraulic)Bank Stability (geotechnical)
DrivingResistingDrivingResisting
Flow depth (y)Critical shear stress (τc)Bank height (H)Effective cohesion (c′)
Channel gradient (S)Erodibility coefficient (k)Bank slope (a)Effective friction angle (φ)
Flow duration (h) Bulk unit weight (γ)Bulk unit weight (γ)
   Vegetation (cr)
  Pore-water pressure (μ)Matric suction (μ)

For cohesionless materials (sands and gravels), critical shear stress (τc) was obtained from the particle-size distribution of a sample using a Shields-type approach. The erodibility coefficient (k) was then obtained from a relation developed by Hanson and Simon (2001) from hundreds of field tests on alluvial materials. For cohesive sediments, a submerged jet-test device was employed in situ which provides data on τc and k. Data for each site are given in Table 4.

Table 4.   Representative Values and Ranges for Geotechnical Parameters Used in Bank-Stability Modeling.
Site: River Kilometerc′ (Pa)φ′ (°)γs (kN/m3)φb (°)
Blackwood: 1.940.6-7.72717.010.0
Blackwood: 2.390.6-3.62717.010.0
UTR: 4.510.9-4.03117.010.0
UTR: 8.450.7-2.627-2818.010.0
UTR: 13.10.6-2.926-3216.9-19.710.2
Ward: 2.480.13318.015.0
Ward: 3.600.13318.010.0

Derivation of Hydraulic Data.  To provide for the driving, hydraulic forces, an annual hydrograph was required. It was decided to use a typical high-flow year that contained a series of high flow events and a long duration snowmelt period to represent a worst-case scenario. Daily data for calendar year 1995 was selected for this purpose (Figure 3). In addition, the rain on snow event of January 1, 1997 was added to the end of the 1995 dataset. The recurrence interval of this flow event was between 33 and 35 years for Blackwood and Ward Creeks, and about 56 years for the Upper Truckee River (Simon et al., 2003). Stage data from four USGS gauging stations were discretized into individual events of given duration to be used as input into the toe-erosion submodel (Figure 4). Data from gauging Station 10336610 was used for the two downstream-most sites on the Upper Truckee River while data from Station 103366092 was used for the more upstream site at the golf course (Table 5; Figure 4). A 48-hour flow duration was used for the January 1, 1997 event with depths ranging from 0.64 m at the Ward Creek site, 1.55 m at the Blackwood Creek sites, and 1.8 m for the Upper Truckee River sites. At each gauging station, a relationship was established between discharge and flow depth from USGS discharge-measurement data, providing a means to calculate flow-depth values (in m) for each event. This was then multiplied by bed slope (in m/m) and the bulk unit weight of water (in kN/m3) to obtain average boundary shear stress for each event. Details of the mean flow depths and durations for each event are provided in Table 5.

image

Figure 3.  Mean-Daily Stage for Upper Truckee River Station 10336610 Showing Multiple Peaks and Generally Prolonged High Flows for 1995.

Download figure to PowerPoint

image

Figure 4.  Hydrographs From 1995 Using Mean-Daily Data for Four USGS Gauging Stations Discretized Into Rectangular-Shaped Event Hydrographs Used as Input Into the Toe-Erosion Submodel of BSTEM.

Download figure to PowerPoint

Table 5.   Flow Duration and Depth for Events From Discretized 1995 Hydrographs (Figure 2).
Event #DatesDurationDepth
BeginEnd(h)(m)
  1. Notes: The second entry for a specific event marks the water-surface depth for simulations of “drawdown” conditions.

  2. 1 Bank height includes adjacent terrace slope.

Blackwood Creek
Bank height (m): 2.4-3.0; Gauge: 10336660
 1 1-Jan10-Jan2160.20
 10-Jan17-Jan1680.36
 17-Jan 9-Mar1,2240.20
 2 9-Mar23-Mar3360.43
 323-Mar26-Apr8160.26
 426-Apr 5-May2160.70
 5 5-May18-May3120.37
 618-May19-Jul1,4880.57
 719-Jul10-Aug5280.30
 10-Aug12-Dec2,9760.20
 812-Dec14-Dec480.52
 14-Dec31-Dec4080.20
Upper Truckee River Downstream
Bank height (m): 2.55; Gauge: 10336610
 1 1-Jan 7-Jan1440.30
  7-Jan20-Jan3120.79
 220-Jan30-Jan2400.53
 330-Jan 7-Feb1920.65
 4 7-Feb18-Feb2640.53
 518-Feb 8-Mar4320.62
 6 8-Mar24-Mar3841.20
 724-Mar 3-Apr2400.72
 8 3-Apr17-Apr3360.84
 917-Apr26-Apr2160.67
1026-Apr 6-May2401.40
11 6-May17-May2640.92
1217-May19-Jul1,5121.38
1319-Jul14-Aug6240.85
1414-Aug 1-Sep4320.55
  1-Sep 9-Dec2,3760.30
15 9-Dec17-Dec1920.95
1617-Dec28-Dec2640.54
 28-Dec31-Dec720.30
Upper Truckee River Upstream
Bank height (m): 2.71; Gauge 113366092
 1 1-Jan 8-Jan1680.25
  8-Jan22-Jan3360.41
 222-Jan 8-Mar1,0800.34
 3 8-Mar15-Mar1680.68
 415-Mar24-Mar2160.53
 524-Mar22-Apr6960.48
 622-Apr 8-May3840.80
 7 8-May18-May2400.60
 818-May17-Jul1,4400.85
 917-Jul17-Aug7440.56
1017-Aug10-Oct1,2960.33
 10-Aug 4-Dec2,7840.25
11 4-Dec 7-Dec720.35
  7-Dec10-Dec720.25
1210-Dec18-Dec1920.52
 18-Dec31-Dec3120.25
Bank height1 (m): 14.9; Gauge: 10336675
 1 1-Jan 8-Jan1680.10
  8-Jan19-Jan2640.34
 219-Jan 9-Mar1,1760.26
 3 9-Mar13-Mar960.43
 413-Mar23-Mar2400.37
 523-Mar25-Apr7920.32
 625-Apr 7-May2880.44
 7 7-May17-May2400.38
 817-May18-Jul1,4880.46
 918-Jul14-Aug6480.34
1014-Aug30-Aug3840.24
 30-Aug10-Dec2,4480.10
1110-Dec17-Dec1680.38
1217-Dec27-Dec2400.24
 27-Dec31-Dec960.10

Iterative Operation of the BSTEM Model

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited

The BSTEM model was run in a series of iterative steps until all of the flow events were simulated.

  • 1
    The effect of the first flow event was simulated using the toe-erosion submodel to determine the amount (if any) of hydraulic erosion and the change in geometry in the bank-toe region (Figure 5).
  • 2
    The new geometry was exported into the bank-stability submodel to test for the relative stability of the bank. Water-table elevation was set to the elevation of the flow in the channel (Figure 6).
    •   a. 
      If the factor of safety (Fs) was greater than 1.0, then geometry was not updated and the next flow event was simulated.
    •   b. 
      If Fs was less than 1.0, failure was simulated and the resulting failure plane became the geometry of the bank for simulation of toe erosion for the next flow event in the series.
    •   c. 
      If the next flow event had an elevation lower than the previous one, the bank-stability submodel was run again using the new flow elevation while maintaining the higher ground-water level to test for stability under drawdown conditions (Figure 7). If Fs was less than 1.0, failure was simulated and the new bank geometry was exported into the toe-erosion submodel for the next flow event.
image

Figure 5.  Example Results From Toe-Erosion Submodel of First Flow Event and Resulting Hydraulic Erosion.

Download figure to PowerPoint

image

Figure 6.  Example Results From the Bank-Stability Submodel Following the First Flow Event. This simulation shows a stable bank.

Download figure to PowerPoint

image

Figure 7.  Example Results From the Bank-Stability Submodel Showing an Unstable Bank Under Drawdown Conditions. In this case, the bank geometry exported to simulate the next flow event is represented by the failure plane (in red) and the original bank toe.

Download figure to PowerPoint

  • 3
    The next flow event in the series was simulated, with Steps 2 and 3 repeated until all events were modeled.

Volumes of sediment erosion by hydraulic and geotechnical processes, and the number of mass failures were noted for each flow event and bank-stability simulation. As the bank-stability submodel provides calculations of the amount of failed material in two dimensions (m2), a reach length of 100 m was assumed for all simulations to provide eroded volumes in m3. Values were summed for all events to obtain the amount of erosion under the prevailing conditions. This process was then repeated to simulate the effects of bank-toe protection and vegetation as stabilizing factors. For bank-toe protection, it was assumed that 256 mm boulders (default value for boulders in the model) had been placed 1.0-1.5 m up the bank toe. A value of 204 Pa was used as τc for this material. To simulate the reinforcing effects of bank-top vegetation, 3.0-23 kPa of cohesion was added (depending on the type of vegetation) to the upper 0.5-1.0 m of the bank (Table 6). Comparison of the volumes of erosion and the number of mass failures under the different scenarios provided a means of calculating the potential reduction in streambank loadings.

Table 6.   Root Reinforcement and Surcharge Values for Bank Top Vegetation at the Upper Truckee River, Ward Creek, and Blackwood Creek Sites.
Site (rkm)Species and AgeRooting Depth (m)Root-Reinforcement (kPa)Surcharge
Upper Truckee (4.51)Wet meadow sedges and grasses0.516.50.0
Upper Truckee (8.45)Wet meadow sedges and grasses with 5 to 10-year-old Lemmon’s willow, Coyote willow0.59.150.0
Upper Truckee (13.1)5-10-year-old Lemmon’s willow, Coyote willow 1.03.020.0
Ward (2.45)30-year-old Lodgepole pine1.023.41.2
Blackwood (1.94)No bank top vegetation---
Blackwood (2.39)5-year-old Lemmon’s willow0.633.020.0

Results of Bank-Model Simulations

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited

Model simulations were carried out iteratively for the sites listed in Table 2 and for the flow events shown in Figure 4 and Table 5. An example set of results for the Upper Truckee River at river kilometer (rkm) 13.1 is provided in Table 7, showing hydraulic erosion and geotechnical stability for the series of flow events. For this site and under existing conditions, 1,288 m3 of material was eroded from the streambank representing 12 periods of hydraulic erosion and four bank failures. Conversion from total erosion to fine-grained erosion was accomplished by multiplying by the percentage of fines comprising the bank material (18%). Toe erosion accounted for 90.5 m3 of the total volume eroded, representing just 7% of the total bank erosion in the reach. With the addition of toe protection which virtually eliminated bank steepening by hydraulic erosion at the bank toe (to 0.1 m3), total bank erosion was reduced by about 89% from 1,288 to 137 m3 over the same period (Table 7). This result is further supported in the reduced frequency of bank failures for each site under the toe-protection scenario (Figure 8), where failure frequency was either completely eliminated or reduced to a single failure event. In each case this failure event corresponded to the January 1-2, 1997 rain on snow event.

Table 7.   Iterative Modeling Results for the Upper Truckee River (km 13.1) for Existing Conditions and With Toe Protection.
Event # 1995Toe ErosionShear Stress (Pa) Amount (m3)Fs SW = GWFailure Amount (m3) Fs DrawdownFailure Amount (m3)Shear Emergence (m)Failure Angle (degrees)Total Erosion (m3)Total Fines (m3)
  1. Note: SW = GW is ground-water level set to surface-water level; Fs is factor of safety. Bold indicates instances of toe erosion or mass wasting, and total values.

Existing conditions (assuming 100 m reach)
 1Yes6.570.71.22No01.21No01,912.03400.700.13
 2Yes6.328.50.95Yes362--01,911.884037167.4
 3Yes8.121.41.56No01.49No01,911.91341.400.25
 4Yes5.340.31.47No01.45No01,911.88340.300.05
 5Yes2.530.21.29No0-No01,911.88340.200.04
 6Yes7.083.50.99Yes1941.37No01,911.8844/3219835.9
 7Yes6.550.51.48No0--01,911.98320.500.09
 8aYes7.89640.91Yes194--01,911.884625847.0
 8bYes7.898.70.97Yes1851.29  1,911.8844.5/3219435.3
 9Yes6.461.11.41No01.35No01,911.9434.510.20
10No3.0401.51No01.49No01,911.9434.500.0
11No3.1301.50No01.47No01,911.9434.500.0
12Yes5.1801.35No01.28No01,911.9134.500.0
1/1/1997Yes13.81.61.03No00.35Yes2621,911.8834.526448.0
Total12 90.5 4935 1262  1,288234
Toe Protection (assuming 100 m reach)
 1No6.5701.41No01.40No01,912.104000
 2No6.3201.44No0--01,912.104000
 3No8.1201.31No01.25No01,912.104000
 4No5.3401.36No01.34No01,912.104000
 5No2.5301.38No0--01,912.104000
 6No7.0801.27No01.19No01,912.104000
 7No6.5501.33No0--01,912.104000
 8No7.8901.26No01.13No01,912.104000
 9No6.4601.34No01.30No01,912.104000
10No3.0401.45No0--01,912.104000
11No3.1301.44No01.43No01,912.104000
12No5.1801.36No01.32No01,912.104000
1/1/1997Yes13.80.11.19No00.28Yes1371,912.104013725.0
Total1 0.1 00 1137  13725.0
image

Figure 8.  Simulated Volumes of Streambank Erosion by Hydraulic and Geotechnical Processes Assuming a 100 m-Long Reach for 1995 and January 1-2, 1997 Under Existing Conditions (E), and With Toe Protection (TP). Sites are listed by stream abbreviation and river kilometer. BW = Blackwood Creek; UT = Upper Truckee River; WA = Ward Creek. Numbers in bold refer to the frequency of bank failures for each scenario.

Download figure to PowerPoint

Similar results were obtained for all other paired simulations (Table 8). Results from the Ward Creek site at rkm 2.48 are somewhat unique in that they represent a large (14.9 m) terrace slope where under existing conditions only one failure was simulated, that occurring during the peak of January 1-2, 1997. With median and average load reductions of 87% and 86%, respectively with the addition of toe protection. These findings highlight the important relationship between hydraulic erosion at the toe that steepens bank slopes and subsequent mass-bank stability. In the simulations conducted here under existing conditions, toe erosion accounted for an average of 13.6% of the total streambank erosion, yet control of that process resulted in a total reduction of almost 90%.

Table 8.   Summary of Iterative Modeling Results for Existing Conditions and With Toe Protection.
RiverrkmConditionToe ErosionFailure ErosionToe ErosionFailure EventsTotal ErosionLoad Reduction
m3m3%#m3m3%
Blackwood1.94Existing4183,19911.673,6173,37393.3
Blackwood1.94Toe protection02440.01244
Blackwood2.39Existing26.74455.7347239884.3
Blackwood2.39Toe protection074.00.0174.0
Upper Truckee4.51Existing, no vegetation17186616.561,03773370.7
Upper Truckee4.51Toe protection0.013040.02304
Upper Truckee13.1Existing90.51,1977.041,2881,15189.4
Upper Truckee13.1Toe protection0.101370.071137
Upper Truckee4.51Existing, vegetation6642413.5349033668.6
Upper Truckee4.51Toe protection, vegetation01540.01154
Upper Truckee8.45Existing1,1612,63330.6103,7943,79299.9
Upper Truckee8.45Toe protection2.2010002.2
Ward2.48Existing, no toe slope14.25,2420.315,2565,256100.0
Ward2.48Toe protection, no toe slope000.000
Ward3.6Existing14346123.7560450283.1
Ward3.6Toe protection366635.31102

A few additional load-reduction scenarios were simulated for the Upper Truckee River and Blackwood Creek. On the Upper Truckee River, these included the addition of top-bank vegetation for the site at rkm 4.51 and bed-slope reduction (by channel relocation) for the site at rkm 13.1. To simulate the reinforcing effects provided by vegetation in the top 1.0m of the bank, an additional 16.5 kPa of cohesion was added to the top layer based on rooting characteristics of the wet meadow vegetation (Table 6). A planned re-configuration of the channel in the vicinity of rkm 13.1 to a bed slope of 0.0015 m/m (a 43% reduction) was used in the toe-erosion component of the model to evaluate the effects of reduced boundary shear on bank-toe erosion and associated loadings from mass failure. A planned slope reduction of about 20% in the vicinity of rkm 1.94 on Blackwood Creek was evaluated similarly.

Load reductions of about 53% were simulated for the case on the Upper Truckee River where root reinforcement was provided to the top 1.0 m of the bank. For locations with higher banks, load reductions would probably not be as significant because the limited extent of rooting depths would provide a smaller increase in overall bank strength. Load reductions from the flattening of bed slope (by the addition of meanders) and the consequent decrease in boundary shear stresses were 54% for the case of the Upper Truckee River and 42% for Blackwood Creek.

Application and Extrapolation of Results

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited

The significant load reductions predicted by iterative modeling pertains to conditions at representative, critical sites yet have provided a relatively consistent estimate of the reduction in the amount of fine-grained sediment provided from the study sites. Extrapolation of these findings was required to obtain an estimate of the total load reduction that could be anticipated for the entire length of the three streams. This was accomplished by combining the modeled results for the sites on each stream with observations of the longitudinal extent of recent bank failures along the main-stem lengths of each stream. Rapid geomorphic assessments (RGAs) that use diagnostic characteristics of channel form to infer dominant, active processes were conducted along each of these streams as part of earlier research (Simon et al., 2003; Simon, 2008). The dominant process and the extent of recent bank failures was noted for each bank in a reach (6-20 channel widths in length) and expressed as one of 5 % ranges (0-10%, 11-25%, 26-50%, 51-75%, and 76-100%) representing the length of the reach that had experienced recent bank failures (Table 9). The midpoint of the range for each bank (left and right) was used to calculate a local mean failure extent. This was then classified as low, moderate, or high so as to apply different unit loads along each reach. Unit loads associated with each class were selected by comparing bank-derived sediment volumes estimated by the numerical simulations with the results of RGAs. For reaches classified as low, a load an order of magnitude lower than the moderate value was used. Unit loads were multiplied by a weighting factor (the product of the percent of reach failing and reach length) representing the total length of banks (left and right) that had recently failed in a reach. Conversion of total erosion to fine-grained erosion was accomplished by multiplying the weighted load by the average percentage of fine-grained material in each reach. Summing for all reaches thus provided values for total and fine-grained streambank-derived sediment loads for the stream.

Table 9.   Example Calculation of Total-Streambank Loads for Blackwood Creek.
Distance (km)Extent of Failures (%)Reach Length (km)Reach Failing (%)Weighting FactorTotal Volume (m3)Fraction <0.063 mm (%)Fines Volume (m3)
LeftRightMean12(1) × (2)/100
  1. Note: Results of RGAs (columns 2 to 3) permitted a mean percentage of each reach experiencing bank failures to be estimated. The mean value for the percent failing of consecutive reaches was multiplied by the reach length to calculate the weighting factor for each reach. Fine-grained loads were determined by multiplying the fraction of fines in each reach by the estimated total load. Shading refers to high (dark gray, white numbers) (36,170 m3/km), moderate (medium gray) (4,720 m3/km), and low (light gray) (472 m3/km) streambank-derived unit loads calculated from data in Table 7.

8.290-100-105.0------
8.190-1026-5021.50.1013.250.013362.55.83.6
7.6911-2511-2518.00.5019.750.098746.60.000.00
7.1811-2511-2518.00.51180.091843.326.011.3
7.1711-2576-10053.00.0135.50.003512826.033.4
6.840-1011-2511.50.3332.250.106450.226.613.4
6.510-1051-7534.00.3322.750.075135422.178.3
6.030-1026-5021.50.4827.750.133262920.0126
5.550-1026-5021.50.4821.50.10324877.938.5
5.080-1051-7534.00.4727.750.130461623.5145
4.1526-5011-2525.50.9329.750.27671,3063.647.0
3.950-1076-10046.50.20360.07202,60421.4557
2.8051-750-1034.01.1540.250.46292,18512.3269
1.9726-5011-2525.50.8329.750.24691,16524.8289
1.7711-2551-7540.50.20330.06602,38716.6396
0.3251-750-1034.01.4537.250.54012,54916.3416
0.0026-5026-5038.00.32360.115254416.388.6

Loadings were calculated for each reach by applying the appropriate total loading rate (high or moderate) to those classed as high or moderate. A worked example is shown for Blackwood Creek in Table 9 using 36,170 m3/km for high-erosion reaches, 4,720 m3/km for moderate erosion reaches, and 472 m3/km for low erosion rates. Fine-grained loadings for each reach were then calculated by multiplying by the measured percentage of fines (<0.063mm) for the site (Table 10).

Table 10.   Percentage of Fine Material (<0.063 mm) Comprising the Banks of the Modeled Reaches.
StreamLocation (rkm)Material Finer Than 0.063 mm (%)
  1. Note: Values represent an average from samples collected at each site.

Blackwood Creek1.9424.8
2.3916.9
Upper Truckee River4.5114.2
8.4513.8
13.118.2
Ward Creek2.486.4
3.605.8

For Ward Creek, the highest loadings rate simulated was for the 14.9 m-high terrace slope (one failure only) and this rate was, therefore, only applied to reaches that contained terrace slopes adjacent to the channel. Loading results for the Upper Truckee River at rkm 8.45 are unrealistically high (Table 8) because of the way that BSTEM handles failed material. Once failure is simulated (Fs < 1.0), the model assumes that the failed material is dispersed into the flow and is not deposited at the bank toe. At this site, however, failed material was observed to contain dense mats of grass roots that came to rest at the bank toe, actually providing a moderate amount of toe protection for the next storm event. This was not accounted for in the iterative modeling. Thus, toe resistance for successive storms was under-estimated, resulting in overpredictions of bank-toe erosion and associated mass failures.

Results of extrapolation of the iterative modeling results were compared to suspended-sediment loads measured near the mouth of the three streams (Simon, 2008) and then further compared to the relative contribution of streambank erosion to total fine-grained loadings from numerical modeling results using the channel evolution model CONCEPTS (Langendoen, 2000) in combination with the upland erosion model AnnAGNPS (Simon et al., 2003). A summary of the results are shown in Table 11. Relative contributions from two other watersheds (General and Third Creeks) (Simon, 2008) are also shown for comparison, and to provide additional data from the basin on streambank contributions. Differences between measured and simulated loads (Table 11) were expected to be great as this study accounts for only those materials derived from streambank processes.

Table 11.   Comparison of Fine-Grained Loadings From Iterative Modeling Results With Measured Loadings at Stream Mouths (Simon, 2006, 2008).
StreamMeasured Load (T)Measured Fine Load (T)Simulated (T)Contribution (%)
  1. Note: Calculations of the contribution of streambank erosion to total fine-grained loadings were made by dividing the loads obtained by iterative modeling (this study) by the measured fine load.

  2. 1 Simulated loads for General and Ward Creeks are from simulations conducted with the CONCEPTS-AnnAGNPS models and reported in Simon et al., 2003.

 1995Jan 1-2, 1997Sum1995Jan 1-2, 1997Sum 
Blackwood Creek5,00217,61022,6121,9278,22310,1504,43243.7
Upper Truckee River8,6523,12911,7813,5001,9585,4585,691104
Ward Creek2,41319,11221,5251,0835,1896,2722,95647.1
General4031,1111,5141001602601171451
Third5,97329.36,0021,3295.21,3341331101

With the exception of the results from the Upper Truckee River where the simulated fine-grained loadings are too high (representing 104% of the measured loads), calculated fine-grained loadings from streambank erosion are reasonable for the period simulated. Fine-grained loadings from streambanks calculated in this study account for 44% and 47% of the total fine-grained loadings (from measured data) for Blackwood and Ward Creeks, respectively (Table 11). Streambank erosion along General Creek (also located on the western side of the basin) accounts for 45% of the fine-grained loadings compared to only 10% in the urbanized Incline Creek Basin. The problem with the results for the Upper Truckee River may still be related to the problem described earlier where failed blocks of material remain in place at the toe, leaving the bank less susceptible to hydraulic erosion for the next modeled flow event. Results presented in Table 11 are not meant to signify that these masses of erosion are expected to occur on an annual basis, given that the flow period selected represented a year with exceptionally high flows. Load reduction estimates, however, based on iterative simulations with toe protection are still valid on the basis of a percent reduction from existing conditions. The greater uncertainty lies in the extrapolation along each stream and is probably related to how BSTEM treats bank material once a failure is simulated.

Cost of Load Reduction

To address potential management scenarios for fine-grained load reduction by toe protection, three options were considered which included treating all reaches (All), treating only those reaches eroding at high rates (H), and treating only those reaches eroding at high and moderate rates (H + M) (Table 12). A cost of US$300 per foot for rock placement was used as the cost basis (obtained from local sources) that was then multiplied by the length of reach represented by each treatment option. This unit cost is an estimate based on the average of several price quotes in the Lake Tahoe area. A median load reduction of 86.8% was used to determine the cost per metric tonne of load reduction. Total load reductions ranged from 33% to 87% depending on the treatment option (length treated). The unit cost (in/T) of performing this type of rehabilitation similarly varied from US$267/T to almost US$2,500/T (Table 12).

Table 12.   Load Reduction and Costs for Performing Bank-Toe Protection Assuming a Unit Cost of US$300/ft for Placement of Stone at the Bank Toe.
StreamLoads (T)Total CostUnit Cost
ExistingToe ProtectionToe Protection(S/T of Load Reduction)
  1. Note: H + M refers to reaches designated as high and moderate.

  AllHigh OnlyH + MAllHigh OnlyH + MAllHigh OnlyH + M
Blackwood Creek4,432585 86.8%2,920 34.1%623 85.9%$8,159,449$403,543$6,840,551$2,121 86.8%$267 34.1%$1,796 85.9%
Upper Truckee River5,691751 86.8%3,789 33.4%914 83.9%$20,911,417$2,601,378$10,735,138$4,233 86.8%$1,368 33.4%$2,247 83.9%
Ward Creek2,956390 86.8%910 69.2%451 84.7%$6,358,661$1,731,594$3,120,669$2,478 86.8%$846 69.2%$1,246 84.7%
Total13,079   $35,429,528$4,736,516$20,696,358   

Summary and Conclusions

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited

Under existing conditions, total streambank erosion by hydraulic and geotechnical processes ranged from 472 to 5,260 m3 of which 35-900 m3 were fine grained (silts and clays). On average, 13.6% of the material was eroded by hydraulic shear, the remainder by mass failures, which occurred about 5 times over the simulation period.

The iterative simulations with 1.0 m-high rock-toe protection showed a dramatic reduction in average, total, and fine-grained streambank erosion (87%; SE = 4.2%). The actual load-reduction range was from 69% to 100%. Failure frequency for the simulation period was reduced in most cases to a single episode, which generally coincided with recession of the January 1-2, 1997 rain-on-snow event. Thus, an almost 90% reduction in streambank loadings was realized by virtually eliminating the erosion of only 14% of the material that was entrained by hydraulic forces. As a consequence, simulations show average load reductions of about an order of magnitude (2,070-127 m3 for total erosion; 292-21.2 m3 for fines). Results stress the critical importance of protecting the bank toe-region from steepening by hydraulic forces that would otherwise entrain previously failed and in situ bank materials, thereby allowing the upper bank to flatten (by failure) to a stable slope. Load reductions by other means, including the addition of bank-top vegetation and bed-slope reduction ranged from 42% to 54%, with the former providing increased bank strength and the latter, reducing average boundary shear stresses for hydraulic bank-toe erosion.

In terms of cost effectiveness, by protecting only the bank toes of the most unstable banks, total bank erosion was predicted to be reduced by one-third for Blackwood and Upper Truckee Rivers, and two-thirds for Ward Creek. Stabilization of only the toe of the most unstable banks is estimated to cost in the region of US$4.7 million vs. a cost of US$35.4 million to protect the toe material of all banks of the three creeks considered here. With the exception of the results from the Upper Truckee River where the simulated fine-grained loadings are too high due to the assumption that failed material is removed immediately after mass failure events, calculated fine-grained loadings from streambank erosion are reasonable for the period simulated.

The use of an iterative method for modeling bank stability through a series of storm events has been shown here to be a practical way of assessing volumes of toe erosion and bank erosion through hydraulic scour and mass failure events. With the application of vegetation, and toe armoring, different mitigation strategies could be tested, and with the use of further data, extrapolation to estimates of fine loadings and a cost-benefit analysis were possible, providing useful information to those parties charged with the management of sediment control within the Lake Tahoe Basin.

Literature Cited

  1. Top of page
  2. Abstract
  3. Introduction
  4. Objectives and Approach
  5. Iterative Operation of the BSTEM Model
  6. Results of Bank-Model Simulations
  7. Application and Extrapolation of Results
  8. Summary and Conclusions
  9. Literature Cited
  • Carson, M.A. and M. Kirkby, 1972. Hillslope Form and Process. Cambridge University Press, New York, 475 pp.
  • Glancy, P.A., 1988. Streamflow, Sediment Transport, and Nutrient Transport at Incline Village, Lake Tahoe, Nevada 1970 – 1973. U.S. Geological Survey Water Supply Paper 2313. Prepared in Cooperation with the Nevada Division of Water Resources and Washoe County, Carson City, Nevada, 53 pp.
  • Goldman, C.R., 1988. Primary Productivity, Nutrients, and Transparency During the Early Onset of Eutrophication in Ultra-Oligotrophic Lake Tahoe, California-Nevada. Limnology and Oceanography 33(6):1321-1333.
  • Handy, R.L. and J.S. Fox, 1967. A Soil Borehole Direct-Shear Test Device. Highway Research News 27:42-51.
  • Hanson, G.J., 1990. Surface Erodibility of Earthen Channels at High Stresses: Part II. Developing an In-Situ Testing Device. Transactions of the ASAE 33(1):132-137.
  • Hanson, G.J., 1991. Development of a Jet Index to Characterize Erosion Resistance of Soils in Earthen Spillways. Transactions of the ASAE 34(5):2015-2020.
  • Hanson, G.J. and A. Simon, 2001. Erodibility of Cohesive Streambeds in the Loess Area of the Midwestern USA. Hydrological Processes 15:23-38.
  • Hill, B.R. and K.M. Nolan, 1990. Suspended-Sediment Factors, Lake Tahoe Basin, California-Nevada. In : International Mountain Watershed Symposium: Subalpine Processes and Water Quality, June 8-10, 1988, Tahoe Resource Conservation District, South Lake Tahoe, California, pp. 179-189.
  • Jassby, A.D., C.R. Goldman, J.E. Reuter, and R.C. Richards, 1999. Origins and Scale- Dependence of Temporal Variability in Transparency of Lake Tahoe, California-Nevada (USA). Limnology and Oceanography 44:282-294.
  • Kroll, C.G., 1976. Sediment Discharge From Highway Cut-Slopes in the Lake Tahoe Basin, California. U.S. Geological Survey Water Resources Investigations 76-19. Prepared in Cooperation with the California Department of Transportation Division of Highways, 85 pp.
  • Langendoen, E.J., 2000. CONCEPTS – CONservation Channel Evolution and Pollutant Transport System, Research Report 16, US Department of Agriculture Agricultural Research Service National Sedimentation Laboratory, Oxford, Massachusetts.
  • Leonard, R.L., L.A. Kaplan, J.F. Elder, R.N. Coats, and C.R. Goldman, 1979. Nutrient Transport in Surface Runoff From a Subalpine Watershed, Lake Tahoe Basin, California. Ecological Monographs 49(3):281-310.
  • Luttenegger, J.A. and B.R. Hallberg, 1981. Borehole Shear Test in Geotechnical Investigations. American Society of Testing and Materials Special Technical Publication 740:566-578.
  • Micheli, E.R. and W. Kirchner, 2002. Effects of Wet Meadow Riparian Vegetation on Streambank Erosion. 2. Measurements of Vegetated Bank Strength and Consequences for Failure Mechanics. Earth Surface Processes and Landforms 27:687-697.
  • Morgenstern, N.R. and V.E. Price, 1965. The Analysis of the Stability of General Slip Surfaces. Geotechnique 15:79-93.
  • Murphy, D.D., 2000. Chapter One: Introduction With key Findings. In : Lake Tahoe Watershed Assessment: Volume I, D.D.Murphy, and C.M.Knoop, (Editors). USDA Forest Service, Pacific Southwest Research Station, Gen. Tech. Rep. PSW-GTR-175, Albany, California, pp. 1-19.
  • Nolan, K.M. and B.R. Hill, 1991. Suspended-Sediment Budgets for Four Drainage Basins Tributary to Lake Tahoe, California and Nevada, 1984-1987. U.S. Geological Survey Water-Resources Investigations Report 91-4054, Sacramento, California, 40 pp.
  • Partheniades, E., 1965. Erosion and Deposition of Cohesive Soils. Journal of Hydraulic Engineering 91(1):105-139.
  • Pollen, N., 2007. Temporal and Spatial Variability in Root Reinforcement of Streambanks: Accounting for Soil Shear Strength and Moisture. Catena 69:197-205.
  • Pollen, N. and A. Simon, 2005. Estimating the Mechanical Effects of Riparian Vegetation on Stream Bank Stability Using a Fiber Bundle Model. Water Resources Research 41(7):W0702510.1029/2004WR003801.
  • Reuter, J.E. and W.W. Miller, 2000. Chapter Four: Aquatic Resources, Water Quality, and Limnology of Lake Tahoe and its Upland Watershed. In : Lake Tahoe Watershed Assessment: Volume I, D.D.Murphy, and C.M.Knoop, (Editors). USDA Forest Service, Pacific Southwest Research Station, Gen. Tech. Rep. PSW-GTR-175, Albany, California, pp. 215-399.
  • Rowe, T.G., D.K. Saleh, S.A. Watkins, and C.R. Kratzer, 2002. Streamflow and Water-Quality Data for Selected Watersheds in the Lake Tahoe Basin, California and Nevada, Through September 1998. U.S. Geological Survey Water Resources Investigations Report 02-4030, Carson City, Nevada, 117 pp.
  • Shields, A., 1936. Anwendung der Aechlichkeitsmechanik und der Turbulenz Forschung auf die Geschiebebewegung. Mitteilungen der Pruessischen Versuchsanstalt fuer Wasserbau and Schiffbau, Berlin.
  • Simon, A., 2006. Estimates of Fine-Sediment Loadings to Lake Tahoe From Channel and Watershed Sources. USDA-ARS National Sedimentation Laboratory Technical Report 52, Oxford, Mississippi, 58 pp.
  • Simon, A., 2008. Fine-Sediment Loadings to Lake Tahoe. Journal American Water Resources Association 44(3):618-639.
  • Simon, A. and A.J.C. Collison, 2002. Quantifying the Mechanical and Hydrologic Effects of Riparian Vegetation on Streambank Stability. Earth Surface Processes and Landforms 27(5):527-546.
  • Simon, A. and A. Curini, 1998. Pore Pressure and Bank Stability: The Influence of Matric Suction. In : Water Resources Engineering ’98, S.R.Abt, J.Young- Pezeshk, and C.C.Watson (Editors). ASCE, Reston, pp. 358-363.
  • Simon, A., A. Curini, S.E. Darby, and E.J. Langendoen, 2000. Bank and Near-Bank Processes in an Incised Channel. Geomorphology 35:183-217.
  • Simon, A., E. Langendoen, R. Bingner, R. Wells, A. Heins, N. Jokay, and I. Jaramillo, 2003. Lake Tahoe Basin Framework Implementation Study: Sediment Loadings and Channel Erosion. USDA-ARS National Sedimentation Laboratory Technical Report, Oxford, Mississippi.
  • Simon, A., N. Pollen, and E. Langendoen, 2006. Influence of Two Woody Riparian Species on Critical Conditions for Streambank Stability: Upper Truckee River, California. Journal of the American Water Resources Association 42(1):99-113.
  • Simon, A., W.J. Wolfe, and A. Molinas, 1991. Mass-Wasting Algorithms in an Alluvial Channel Model. In : Proceedings of the Fifth Federal Interagency Sedimentation Conference, Las Vegas, Nevada, pp. 8-22-8-29.
  • Stubblefield, A.P., 2002. Spatial and Temporal Dynamics of Watershed Sediment Delivery, Lake Tahoe, California. PhD Dissertation. University of California at Davis, Davis, California.
  • Thorne, C.R., 1982. Processes and Mechanisms of River Bank Erosion. In : Gravel-Bed Rivers, R.D.Hey, J.C.Bathurst, and C.R.Thorne (Editors). John Wiley and Sons, Chichester, England, pp. 227-271.
  • Thorne, C.R., 1990. Effects of Vegetation on Riverbank Erosion and Stability. In : Vegetation and Erosion, J.B.Thornes, (Editor). John Wiley & Sons, Chichester, England, pp. 125-144.
  • Thorne, C.R. and N.K. Tovey, 1981. Stability of Composite River Banks. Earth Surface Processes and Landforms 6:469-484.
  • USDA Forest Service, 1994. Blackwood Creek Water Quality Monitoring Report, Water Years 1980-1993. USDA Forest Service, Lake Tahoe Basin Management Unit, South Lake Tahoe, California, January 1994, 52 pp.