E-mail

E-mail a Wiley Online Library Link

Vasilis M. Fthenakis and Hyung Chul Kim Life cycle assessment of high-concentration photovoltaic systems Progress in Photovoltaics: Research and Applications 21

Article first published online: 30 MAY 2012 | DOI: 10.1002/pip.1186

Thumbnail image of graphical abstract

The life-cycle of the Amonix HCPV systems with II/V solar cells operating in the US Southwest has a lower environmental profile than that of conventional flat-plate crystalline Si systems operating in the same high-insolation regions. The estimated energy payback time of the Amonix 7700 PV system in operation at Phoenix, AZ, is only 0.9 years.

Complete the form below and we will send an e-mail message containing a link to the selected article on your behalf

Required = Required Field

SEARCH